NB/T 20005.4-2012 in English
SUPERSEDEDCarbon Steel and Low Alloy Steel for Pressurized Water Reactor Nuclear Power Plants. Part 4: the Forged or Rolled Parts for Use in Steam Generator Main Steam Systems
- Issued on:2012-01-06
- Implemented on:2012-04-06
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
Scope
This part specifies the technical requirements for the manufacturing, chemical composition, mechanical properties, test methods, inspection rules and other technical requirements of P280GH forged and rolled parts for the main steam system, main feed water flow control system, auxiliary water supply system and turbine bypass system of pressurized water reactor nuclear power plants. . This section applies to P280GH forgings and rolled parts for the main steam system, main feed water flow control system, auxiliary water supply system and turbine bypass water supply system of pressurized water reactor nuclear power plants.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 10217-2019 in English
Guide of production preparation for wind farm
2019-06-04 -

NB/SH/T 6060-2022 in English
Standard test method for determination of chlorine in reforming catalyst-Potentiometric titration method
2022-05-13 -

NB/T 20302-2014 in English
Specification of safety class low-voltage three-phase asynchronous motors for nuclear power plants
2014-06-29 -

NB/T 20417-2017 in English
Fire dampers for nuclear power plant venting and smoke-venting system
2017-02-10 -

NB/T 25041-2014 in English
Functional safety requirements of automatic fire alarm system in conventional island of nuclear power plants
2014-06-29 -

NB/T 10684-2021 in English
Specification for Quality Management of Wind Power Projects
2021-04-26 -

NB/T 11030-2022 in English
General requirements for coal mine low concentration gas generator set
2022-11-04 -

NB/T 10757-2021 in English
Device of foam suppression dust for mine
2021-11-16 -

NB/T 10740-2021 in English
Daily safety inspection regulation for large truck operation in open pit coal mine
2021-11-16 -

NB/T 20358.14-2021 in English
Budget quotas of nuclear power plant construction project works Part 14:Manufacture of module and containment vessel
2021-01-07