NB/T 20008.3-2012 in English
VALIDOther Material for Pressurized Water Reactor Nuclear Power Plants - Part 3: Class 3 Copper-aluminium Alloy Castings for Auxiliary System Pumps and Valves
- Issued on:2012-01-06
- Implemented on:2012-04-06
- File Format:PDF
- Delivery:Via email within 1~3 business days
$233.00
Scope
This part specifies the technical requirements for the manufacturing, chemical composition, mechanical properties, non-destructive testing and other technical requirements for copper-aluminum alloy castings of the third-stage pump of the auxiliary system of a pressurized water reactor nuclear power plant and various valve parts. This part specifies the copper-aluminum alloy castings for the impellers of the third-stage pumps of the auxiliary system of pressurized water reactor nuclear power plants and various valve parts.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 47019.1-2021 in English
Purchase technical specification for boiler & heat exchanger tubes一Part 1: General requirements
2021-01-07 -

NB/T 42071-2016 in English
The technical specification of intelligent unit for protection and control in smart substation
2016-08-16 -

NB/T 25109-2020 in English
Technical guidelines of flowrate balancing test for nuclear power plant ventilation system
2020-10-23 -

NB/T 20520-2018 in English
General requirements for metal hose assemblies in nuclear power plant
2018-12-10 -

NB/T 10382-2019 in English
Technical specification for detection and inspection of coal preparation flotation compound reagent
2019-12-30 -

NB/T 47062-2017 in English
Biomass molded fuel fired boilers
2017-12-27 -

NB/T 20335-2015 in English
Nuclear power plant software configuration management
2015-04-02 -

NB/T 31116-2017 in English
Technical Code for Social Stability Risk Analysis of Wind Power Projects
2017-11-15 -

NB/T 20162-2012 in English
Technical Requirements on the Cleaning Areas Establishment and Maintenance of PWR Nuclear Island Equipment During Storage, Installation and Start-up
2012-10-19 -

NB/T 20293-2014 in English
Procedure of nuclear power plant siting
2014-06-29