Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
feasibility study report engineering feasibility study report authorized preliminary feasibility study report nuclear power plants nepa-rg1 content nuclear power plants compound voltage overcurrent protection compound voltage overcurrent protection titanium alloys chaptercontent overview half-countersunk head bolts
NB/T 20034-2010 in English

NB/T 20034-2010 in English

VALID

Regulation for Content of Feasibility Study Report of Nuclear Power Plants

  • Issued on:2010-05-01
  • Implemented on:2010-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $380.00
$369.00
Standard No: NB/T 20034-2010
Document status: VALID
Title in English: Regulation for Content of Feasibility Study Report of Nuclear Power Plants
Title in Chinese: 核电厂可行性研究报告内容深度规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2010-05-01
Implemented on: 2010-10-01
Professional Classification: NB-Energy
Related Keywords: feasibility study report
engineering feasibility study report
authorized preliminary feasibility study report
nuclear power plants nepa-rg1 content
nuclear power plants
Related Topics: nb/t 20030-2010
self audit report
research report
sex studies
The main research content of this paper:
The main research content of this paper:
Research content of this article
3. Research content of this paper
Research content of this paper:
The main research content of this paper
1. Main content of the research
2. Research content and
Content of report
The main content of this research
19. Main contents of the report
research report
feasibility study
Main research content
feasibility study
The main research content of this paper
How much research content
The main content of this research
The main research content of this paper:
time study
Research content of this article
Research content of this article
endosome density
The main content of this research:
The content of this study
2. Research content of this paper
1. Main research content
Senior Special Studies
main research content
3. Research content
System research content
Research work content
For the research content of this paper
action content
research content work
work study content
14th Five-Year Research Report
Main research technical content
Industry Research Report
content depth
ELISA research report template
Brain-like intelligence research content
Preparation of feasibility study report for coal preparation plant
Qualitative and Quantitative Research Methods
nb/t20003-2010
nb/t 20027-2010
nb/t 20021-2010


1 Scope

This standard specifies requirements for basic work content and report preparation of engineering feasibility study report of nuclear power plants and is the essential basis for report preparation and examination.

This standard is applicable to newly-built, expanded or rebuilt engineering projects of nuclear power plants.

2 Normative References

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB 6249 Regulations for Environmental Radiation Protection of Nuclear Power Plant
HAF 001/01 Application and Issue of Nuclear Power Plant Safety License
HAD 102/09 Ultimate Heat Sink and Directly-related Heat Transfer System of Nuclear Power Plant
HAD 501/02 Physical Protection of Nuclear Facilities
HAF-J 0067 Format and Content of Plant Site Safety Analysis Report for Feasibility Study Stage of Nuclear Power Plants
NEPA-RG1 Content and Format of Environmental Impact Reports for Nuclear Power Plants
HEZONGFA [1995] No. 136
Design Regulation for Occupational Safety and Health of Nuclear Power Plant
WEIFAJIANFA [2002] No.63
Catalogue for Classification of Occupational Hazard Factors
FAGAITOUZI [2006] No. 1325
Methodology and Parameters of Economic Assessment on Construction Projects
Revised No. 24 Decree of Ministry of Water Resources in July 2005
Administrative Regulations on Preparation and Examination of Water and Soil Conservation Scheme for Development and Construction Projects

3 General Provisions

3.1 For newly-built or expanded engineering of nuclear power plants, feasibility study shall be carried out and engineering feasibility study report shall be prepared to provide scientific basis for project decision. The feasibility study report shall be prepared based on authorized preliminary feasibility study report according to The National Electricity Master Plan and National Nuclear Power Development Planning.

3.2 Mature and advanced technology shall be adopted for the engineering construction of nuclear power plant and high-efficient, energy-saving, land-saving, water-saving, material-saving, consumption-reducing and environmental schemes are strongly recommended.

3.3 Engineering feasibility study (including monographic study) of nuclear power plant shall be entrusted to the organization with appropriate qualification; the organization responsible for the study shall be selected in accordance with the relevant national requirements for construction and management of engineering project.

Foreword i
Introduction ii
1 Scope
2 Normative References
3 General Provisions
4 Preparation Content and Depth of Report
5 Attached Drawings to the Report
6 Supportive Documents of Report
Annex A (Normative) Division Principle and Requirements for Volume and Book of Feasibility Study Report

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend