Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
pwr nuclear power plant scopethis standard nuclear power plants containment penetration installation other reactor-type nuclear power plants technical regulation square underground metal ip videoconference system scopethis provision applies
NB/T 20108-2012 in English

NB/T 20108-2012 in English

SUPERSEDED

Technical Regulation of Containment Penetration Installation in PWR Nuclear Power Plant

  • Issued on:2012-01-06
  • Implemented on:2012-04-06
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $120.00
$117.00
Standard No: NB/T 20108-2012
Document status: SUPERSEDED
Superseded by: NB/T 20108-2021 Technical regulation of containment penetration installation in PWR nuclear power plants
Superseded on: 2021-07-26
Title in English: Technical Regulation of Containment Penetration Installation in PWR Nuclear Power Plant
Title in Chinese: 压水堆核电厂安全壳贯穿件安装技术规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-01-06
Implemented on: 2012-04-06
Professional Classification: NB-Energy
Related Keywords: pwr nuclear power plant scopethis standard
nuclear power plants
containment penetration installation
other reactor-type nuclear power plants
technical regulation
Related Topics: PWR
nb/t 20186-2012
Penetration room
NB/T+20186-2012
nb/t20039.3-2012
nb/t20119-2012
Nuclear Power Plant Engineering Hydrology Technology
Nuclear Power Plant Engineering Hydrology Technology
Mechanical module installation of pressurized water reactor nuclear power plant
PWR nuclear power plant loose parts and
nb/t 20192-2012
Technical regulations for installation of lifting equipment in nuclear power plants
Nuclear Power Plant Safety Level Medium Voltage Technical Conditions
Technical specification for installation of rod power system in pressurized water reactor nuclear power plant
nb/t 20039.3-2012
nb/t20039.8-2012
nb/t20133.6-2012
nb/t 20182-2012
wear
Throughout
nb/t 20136-2012
nb/t 20193-2012
Pressurized water reactor nuclear power plant
Containment
High voltage power supply safety technology
NB/T31022-2012
Nuclear power plant safety
Nuclear power plant safety prevention engineering installation technology
Nuclear power installation project safety
nb/t20193-2012
nb/t47025-2012
nb/t47021-2012
nb/t 20139-2012
Pressurized Water Reactor Standard
nb/t 20123-2012
nb/t 20185-2012
nb/t 20194-2012
nb/t47023-2012
nb/t 47022-2012
nb/t47024-2012
nb/t20125-2012
nb/t 47027-2012
nb/t10558-2012
nb/t47022-2012
nb/t 20247-2012
nb/t20096-2012
nb/t 47021-2012


Scope

This standard specifies the basic requirements for the installation and inspection of penetrations (mechanical penetrations and electrical penetrations) on the containment of pressurized water reactor nuclear power plants. This standard applies to the installation and inspection of penetration parts on the containment of pressurized water reactor nuclear power plants, including: unpacking inspection, transportation, assembly, welding, detection, testing, and inspection. Other reactor-type nuclear power plants can follow suit.

Sample only — not a preview of NB/T 20108-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • NB/SH/T 0586-2010 in English

    NB/SH/T 0586-2010 in English

    Criteria for Changing Oil of Enclosed Industrial Gear Oil

    2010-05-01
  • NB/T 11137-2023 in English

    NB/T 11137-2023 in English

    TBVF series mine explosion-proof permanent magnet synchronous variable frequency motor

    2023-02-06
  • NB/T 11022-2022 in English

    NB/T 11022-2022 in English

    Carbon fiber reinforced polymer matrix composite stranded core for overhead electrical conductors

    2022-11-04
  • NB/T 20005.2-2019 in English

    NB/T 20005.2-2019 in English

    Carbon steel and low alloy steel for pressurized water reactor nuclear power plant. Part 2: Forgings for class 2|| 3 heat exchanger tube plates

    2019-12-30
  • NB/T 20403-2017 in English

    NB/T 20403-2017 in English

    Subcompartment pressure and temperature transient analysis in pressurized water reactors

    2017-02-10
  • NB/T 31047.2-2022 in English

    NB/T 31047.2-2022 in English

    Specification for dispatching and operating management of wind power-Part 2: Offshore wind power

    2022-11-04
  • NB/T 20009.36-2018 in English

    NB/T 20009.36-2018 in English

    Welding material for pressurized water reactor nuclear power plants -Part 36: Electrodes for gas shielded are welding for containment vessel

    2018-12-10
  • NB/T 33020-2015 in English

    NB/T 33020-2015 in English

    Technical specification for charger of electric vehicle battery swap station

    2015-04-02
  • NB/T 10848-2021 in English

    NB/T 10848-2021 in English

    Technical specification for environmental monitoring of groundwater in shale gas development project

    2021-11-16
  • NB/T 11123-2023 in English

    NB/T 11123-2023 in English

    Safety double prevention mechanism for coal mine - Specification

    2023-02-06