NB/T 47053-2016 in English
VALIDSafety self-locking quick opening closures
- Issued on:2016-12-05
- Implemented on:2017-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
| Standard No: | NB/T 47053-2016 |
| Document status: | VALID |
| Title in English: | Safety self-locking quick opening closures |
| Title in Chinese: | 安全自锁型快开盲板 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2016-12-05 |
| Implemented on: | 2017-05-01 |
| Professional Classification: | NB-Energy |
| Related Keywords: | self-locking quick opening closures introductionthis standard
self-locking quick-opening blind plate safety features necessary safety self-locking |
| Related Topics: | nb/t20391-2016
nb/t20387-2016 nb/t 20369-2016 nb/t 20376-2016 NB/T51062-2016 Quick opening blind plate automatic unlock NB/T47052-2016 NB/T51063-2016 How to unlock the safety lock of biological safety cabinet nb47053 nb/t 47052-2016 nb/t47049-2016 nb/t 51065-2016 nb/t 32025-2016 nb/t 47054-2016 |
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 31134-2018 in English
Environmental dura bility assessment of key components of offshore wind power generation equipment: Power generator
2018-04-03 -

NB/T 35029-2014/XG1-2019 in English
Code for engineering survey of hydropower projects,includes Amendment 1
2019-11-04 -

NB/T 35121-2018 in English
Code for Design of Gully Treatment for Hydropower Projects
2018-06-06 -

NB/T 14011-2023 in English
Shale gas一Technical requirement of seismic data processing and interpretation and prediction
2023-10-11 -

NB/T 10752-2021 in English
Drilling communication device for mine rescue
2021-11-16 -

NB/T 10804-2021 in English
Code for Planning and Design of Rural Resettlement for Hydropower Projects
2021-11-16 -

NB/T 20006.32-2016 in English
Alloy steel for pressurized water reactor nuclear power plants. Part 32:15Cr1Mo forgings for containment vessel mechanical penetrants
2016-02-05 -

NB/T 32043-2018 in English
Specification for Preparation of Feasibility Study Report for Photovoltaic Power Proj ects
2018-06-06 -

NB/T 20037.11-2018RK in English
Level 1 Probabilistic safety assessment for nuclear power plant applications. Part 11:Interal Events at-power
2018-03-22 -

NB/T 25016.13-2016 in English
Surveillance guide for conventional island equipment in nuclear power plant Part 13: High voltage motor
2016-02-05