Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
meteorological disaster monitoring monitoring station network configuration monitoring system construction real-time monitoring real-time weather monitoring electrical apparatus d flow measurement calibration facility 288-2015 requirements industry average level measurement accuracy ±0.4mm
QX/T 440-2018 in English

QX/T 440-2018 in English

VALID

Guidelines for the construction of meteorological disaster monitoring and warning systems in county

  • Issued on:2018-09-20
  • Implemented on:2019-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $340.00
$330.00


Introduction

Standard Framework and Technological Evolution

QX/T 440-2018, my country's first county-level special standard for meteorological disaster monitoring and early warning, establishes the configuration requirements for core facilities such as regional automatic weather stations and real-time weather video surveillance. Compared with the early basic specifications such as QX/T 315, the innovation of this standard is reflected in:

Comparison dimensionTraditional standardQX/T 440-2018
Monitoring density1 benchmark station at the county levelFull coverage at the township level + encryption in key areas
Warning timelinessHourly update10-minute short-term warning
Cross-departmental collaborationOne-way information reportingMulti-department data sharing platform

Key points for monitoring system construction

4.1 Monitoring Station Network Configuration

The standard requires the formation of a three-tier monitoring network:

  1. National Reference Station: At least one per county, in compliance with the detection environment requirements of GB 31221
  2. Regional Automatic Station: Full coverage of townships, with 100% density in sensitive areas
  3. Professional Observation Station: Configured on-demand with special monitoring equipment such as agricultural meteorology and lightning location

Typical Case: A county in Zhejiang Province deployed eight four-element automatic stations in a 50km² basin, achieving real-time monitoring of flash floods through real-time weather monitoring, reducing warning response time by 40%.


Suggestions for Implementation of Warning Response

7.1 Emergency Linkage Mechanism

The standard requires the establishment of a three-level response process:

Response LevelTrigger ConditionsHandling Measures
Blue/YellowGeneral WarningOn-Duty Standby + Information Notification
OrangeMajor RiskSuspension of Work and School + Personnel Transfer
RedExtreme DisasterWhole-Area Emergency + Material Allocation

Key Tip: It is necessary to prepare Disaster Prevention and Risk Avoidance Cards in advance and clarify transfer routes and resettlement points


Long-term Guarantee Mechanism

Chapter 8 of the standard specifies four guarantee measures:

  • Organizational guarantee: 100% establishment of meteorological workstations at the county and township levels
  • Financial guarantee: Construction funds are included in the fiscal budget
  • Team guarantee: Each village is equipped with one meteorological information officer
  • Evaluation mechanism: Annual compliance assessment ≥ 85 points (Appendix A)

Sample only — not a preview of QX/T 440-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend