Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
technical requirements laboratory general requirements core facility requirements facility experimental animal facilities technical indicators melted welding fluxes-the molybdenumblue photometric method test piece inspection automobile windshield washer fluids
RB/T 047-2020 in English

RB/T 047-2020 in English

VALID

Competence assessment of management and technical for inspection body and laboratory—General requirements for facilities and environment

  • Issued on:2020-08-26
  • Implemented on:2020-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: RB/T 047-2020
Document status: VALID
Title in English: Competence assessment of management and technical for inspection body and laboratory—General requirements for facilities and environment
Title in Chinese: 检验检测机构管理和技术能力评价 设施和环境通用要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2020-08-26
Implemented on: 2020-12-01
ICS Classification: 03.120.20-Product and company certification. Conformity assessment
Related Keywords: technical requirements
laboratory general requirements
core facility requirements facility
experimental animal facilities
technical indicators
Related Topics: Ability Evaluation
testing facility
RB∕T
testing facility
rb/t 195
Inspection and Testing Organization
Inspection and Testing Organization
rb/t 190
rb/t 115
rb/t 205
rb/t 204
technology rb
rb/t
rab rb
rb/t 116
National Testing Organization
Testing equipment management technology
rb/t+
rb /t
rb/t 119
rb t
Technical Testing Capability
Environmental detection ability
Measurement and inspection equipment evaluation
technical skills
RB T 199
technical skills
Ability Evaluation
Ellipse technology environmental detection
rb t 119
rb /t 120
rb/t 120
Detection and testing capabilities
rb/t 199
rb period
rb/t 104
rb/t 191
Universal Environmental Detector
RB RB/T
rb/t 188
RB/T 047-2020
Radiographic testing environment requirements
Inspection and testing technology requirements are high,
Liquid quality testing capability evaluation
rb/t047
t sxdz 047
rb 043 2020
rb t 14
rb/t 089
rb/t028-2020
rb/t063-2020


Introduction

Standard Framework and Technology Evolution

As an important supplement to GB/T 27025, RB/T 047-2020 systematically integrates the technical requirements for special places such as biosafety laboratories and experimental animal facilities for the first time. Compared with the 2015 version, new acceptance clauses for mobile detection devices are added, and intelligent requirements such as real-time alarm for wastewater treatment are strengthened.


Analysis of core facility requirements

Facility typeKey technical indicatorsCompliance basis
Fixed placeZoning management (core/auxiliary/public)Clause 5.1.1
Power supply and distribution systemBackup power supply configuration requirementsClause 5.2.2.2
Gas supplyDistance between combustible and combustion-supporting gases ≥5mClause 5.2.3.1b

Application case: Transformation of third-party testing laboratory

According to clause 6.2.1 of the standard, an environmental testing agency upgraded the temperature control system in the physical and chemical analysis area to a 16-26±1℃ precision air conditioner, controlled humidity fluctuation within the range of ±5%, and passed the CMA review.


Key technical indicators of environmental control

  • Noise control: ≤55dB(A) in detection area (Clause 6.2.4)
  • Air quality management: PM2.5 daily average value ≤75μg/m³ (GB/T 18883)
  • Electromagnetic protection: Shielding effectiveness in the 30MHz-1GHz frequency band ≥60dB

Implementation suggestions

  1. It is recommended to adopt a modular power distribution system for new laboratories (Clause 5.2.2)
  2. Hazardous chemical storage should be equipped with double-locked and leakage alarm devices
  3. Regularly conduct environmental condition verification tests (Clause 6.1)

Sample only — not a preview of RB/T 047-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • RB/T 144-2018 in English

    RB/T 144-2018 in English

    Guidance of technical competence assessment for testing body in building materials field

    2018-06-04
  • RB/T 035-2020 in English

    RB/T 035-2020 in English

    Classification for scope of accreditation of laboratories

    2020-08-26
  • RB/T 162-2017 in English

    RB/T 162-2017 in English

    Quality management systems-Cleaning and disinfecting services of central air conditioning ventilation system-Requirements

    2017-05-27
  • RB/T 301-2016 in English

    RB/T 301-2016 in English

    Conformity assessment—General technical rules for service certification

    2016-06-22
  • RB/T 037-2020 in English

    RB/T 037-2020 in English

    Guidance for evaluating equivalence of standard methods of food microbiological examinations

    2020-08-26
  • RB/T 181-2017 in English

    RB/T 181-2017 in English

    Processes of supervision and destruction for products exempted from China Compulsory Certification- General requirements

    2017-01-03
  • RB/T 029-2020 in English

    RB/T 029-2020 in English

    Developing guideline for laboratory information management systems

    2020-08-26
  • RB/T 075-2021 in English

    RB/T 075-2021 in English

    Evaluating specifications for carbon sequestration techniques in cultivated land

    2021-11-04
  • RB/T 044-2020 in English

    RB/T 044-2020 in English

    Competence assessment of management and technical for inspection body and laboratory-Requirements for lightning protection system inspection

    2020-08-26
  • RB/T 038-2020 in English

    RB/T 038-2020 in English

    Guidance for quality monitoring of food microbiology test results

    2020-08-26