SL 229-2000 in English
VALIDSpecification on automation design of small hydropower station
- Issued on:2000-06-14
- Implemented on:2000-07-01
- File Format:PDF
- Delivery:Via email within 5 business days
$350.00
SL229-2000适用于水电站总装机容量为50MW 及以下,电压等级为11okV 及以下的新建水电站。扩建、改建工程和单机容量在1MW 以下的新建水电站可参照执行。
Scope
SL 229-2000 is suitable for new hydropower stations with a total installed capacity of 50MW and below and a voltage level of 110kV and below. Expansion and reconstruction projects and new hydropower stations with a single unit capacity of less than 1MW can be implemented accordingly.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 223-1999 in English
Specification of construction acceptance on water resources and hydroelectric development
1999-03-19 -

SL 160-2012 in English
Regulation for hydraulic and thermal model in cooling water projects
2012-07-13 -

SL 5-1995 in English
Economic evaluation code for small hydropower projects
- -

SL 222-2013 in English
Design guidelines of power system for rural regions supplied with hydropower
2013-10-28