Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
new hydropower stations automation design station scopesl hydropower single unit capacity percent oil derricks failure time method
SL 229-2000 in English

SL 229-2000 in English

VALID

Specification on automation design of small hydropower station

  • Issued on:2000-06-14
  • Implemented on:2000-07-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $360.00
$350.00

SL229-2000适用于水电站总装机容量为50MW 及以下,电压等级为11okV 及以下的新建水电站。扩建、改建工程和单机容量在1MW 以下的新建水电站可参照执行。


Scope

SL 229-2000 is suitable for new hydropower stations with a total installed capacity of 50MW and below and a voltage level of 110kV and below. Expansion and reconstruction projects and new hydropower stations with a single unit capacity of less than 1MW can be implemented accordingly.

Sample only — not a preview of SL 229-2000
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend