SL 294-2003 in English
ABOLISHEDGuidelines of reconnaissance for rural hydropower station development program
- Issued on:2003-12-22
- Implemented on:2004-04-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$330.00
$321.00
$321.00
Scope
This guideline is applicable to the selection of power supply development plans for rural hydropower construction and the selection of power station sites with an installed capacity of 50MW-0.5MW and an outlet voltage level of 110kV and below. Power stations with an installed capacity of less than 0.5MW can be used as a reference.
Sample only — not a preview of SL 294-2003

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL/T 381-2021 in English
Specifications for manufacturing, installation and acceptance of hoists for water conservancy and hydropower projects
2021-10-26 -

SL 714-2015 in English
Technical specification of safety protection facility for construction of water and hydropower projects
2015-05-22