SL 41-2011 in English
SUPERSEDEDDesign code for gate hoist in water resources and hydropower projects
- Issued on:2011-03-09
- Implemented on:2011-06-09
- File Format:PDF
- Delivery:Via email within 10 business days
$2,765.00
本标准适用于水利水电工程以电力驱动为主,用以启闭闸门、拦污栅的卷扬式启闭机、液压启闭机、螺杆启闭机和链式启闭机的设计,其中卷扬式启闭机包括固定卷扬式启闭机和门式、台车式、桥式等移动启闭机。
Scope
This standard applies to the design of winch hoists, hydraulic hoists, screw hoists and chain hoists that are mainly driven by electricity in water conservancy and hydropower projects and are used to open and close gates and waste racks. Hoist hoists include fixed winch hoists and mobile hoists such as portal, trolley and bridge hoists.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 374-2017 in English
Flake ice storuge for pre-coolingr conicrete
2017-05-05 -

SL 41-2018 in English
Hydraulic and hydroelectric engineering spesification for design of gate hoist
2018-10-23 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08