Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
detention area preplan scopethese guidelines flood storage detention area operation plans national flood storage other flood storage bicycle surface coatings bevel protracter remote identification system
SL 488-2010 in English

SL 488-2010 in English

VALID

Guidelines for flood storage and detention area preplan

  • Issued on:2010-08-20
  • Implemented on:2010-11-20
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $340.00
$330.00
Standard No: SL 488-2010
Document status: VALID
Title in English: Guidelines for flood storage and detention area preplan
Title in Chinese: 蓄滞洪区运用预案编制导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2010-08-20
Implemented on: 2010-11-20
Professional Classification: SL-Water Resources
Related Keywords: detention area preplan scopethese guidelines
flood storage
detention area operation plans
national flood storage
other flood storage
Related Topics: plan
case
stagnant
use
/case
Flood storage and detention area

本导则适用于国家蓄滞洪区运用预案的编制,其他蓄滞洪区运用预案的编制可参照执行。


Scope

These guidelines are applicable to the preparation of national flood storage and detention area operation plans, and the preparation of other flood storage and detention area operation plans can be implemented with reference.

Sample only — not a preview of SL 488-2010
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend