Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
feasible study report water resources feasibility study reports medium-sized water conservancy engineering scopethis standard prefabricated substation gb/t automobile disc wheel inner nuts m16×1.5 ~ m20×1.5 green universal lithium ion battery
SL 618-2013 in English

SL 618-2013 in English

SUPERSEDED

Specification for compiling feasible study report of water resources and hydropower engineering

  • Issued on:2013-11-20
  • Implemented on:2014-02-20
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,830.00
$1,776.00
Standard No: SL 618-2013
Document status: SUPERSEDED
Superseded by: SL/T 618-2021 Code of preparing feasibility study reports for water and hydropower projects
Superseded on: 2021-11-06
Title in English: Specification for compiling feasible study report of water resources and hydropower engineering
Title in Chinese: 水利水电工程可行性研究报告编制规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2013-11-20
Implemented on: 2014-02-20
Superseding: DL 5020-1993 Specifications on Compiling Feasibility Study Report of Water Conservancy and Hydropower Projects
Professional Classification: SL-Water Resources
Related Keywords: feasible study report
water resources
feasibility study reports
medium-sized water conservancy
engineering scopethis standard
Related Topics: water conservancy
hydropower project
Moisture Method Report
research report
sex studies
qc/t 618-2013
Frontier Research on Genetic Engineering
Water conservancy project
Frontiers of Genetic Engineering Research
feasibility
research report
research tool
research tool
feasibility study
Water Resources and Hydropower
feasibility study
14th Five-Year Research Report
genetic engineering research
Industry Research Report
Water Resources and Hydropower Engineering
Regulations for preparation of feasibility study report for soil and water conservation projects
Feasibility of water conservancy and hydropower projects
Durability of water conservancy and hydropower projects
ELISA research report template
Fire protection in water conservancy and hydropower projects
Preparation of resettlement acceptance report for water conservancy and hydropower projects
Preparation of feasibility study report for coal preparation plant

替代DL5020-93,2014-2-20实施。本标准适用于新建、改建、扩建的大、中型水利水电工程项目建议书的编制,不同类型工程可根据其工程特点对本标准规定的编制内容有所取舍。除险加固项目可参照执行。


Scope

This standard is applicable to the preparation of feasibility study reports for large and medium-sized water conservancy and hydropower projects that are newly built, renovated, and expanded. Different types of projects may choose to prepare content specified in this standard based on their engineering characteristics. Risk removal and reinforcement projects can be implemented as a reference.

Sample only — not a preview of SL 618-2013
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • SL 275-2001 in English

    SL 275-2001 in English

    Field test methods for nuclear density-moisture gauges

    2002-01-28
  • SL 19-2001 in English

    SL 19-2001 in English

    Compilation rules of final account for completion of water capital construction project

    2001-02-08
  • SL 42-2010 in English

    SL 42-2010 in English

    Technical standard for determination of sediment particle size in open channels

    2010-01-29