Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
construction quality acceptance assessment separated item project construction quality assessment standard hydroelectric engineering-levee works scopethis standard water conservancey model denomination moringa leaf powder service test method
SL 634-2012 in English

SL 634-2012 in English

VALID

nspection and Assessment Standard for Separated Item Project Construction Quality of Water Conservancey and Hydroelectric Engineering-Levee Works

  • Issued on:2012-09-19
  • Implemented on:2012-12-19
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $810.00
$786.00
Standard No: SL 634-2012
Document status: VALID
Title in English: nspection and Assessment Standard for Separated Item Project Construction Quality of Water Conservancey and Hydroelectric Engineering-Levee Works
Title in Chinese: 水利水电单元工程施工质量验收评定标准 堤防工程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2012-09-19
Implemented on: 2012-12-19
Superseding: SL 239-1999 Assessment and acceptance specification for construction quality of levee project
ICS Classification: 27.140-Hydraulic energy engineering
Professional Classification: SL-Water Resources
Related Keywords: construction quality acceptance assessment
separated item project construction quality
assessment standard
hydroelectric engineering-levee works scopethis standard
water conservancey
Related Topics: embankment
hydropower project
Ministry of Water Resources
embankment works
standard engineering
Quality acceptance criteria
HJ 634-2012
embankment works
embankment
sl 582 2012
Quality acceptance
sl 585 2012
Engineering construction quality acceptance
Construction Quality
Construction quality acceptance
Unit quality assessment of hydropower and water conservancy capital construction projects
Water Resources and Hydropower Engineering
Water Conservancy and Hydropower Engineering Unit Project
Quality acceptance
Construction quality acceptance of underground waterproofing works
Acceptance of construction quality of precipitation engineering
Construction survey of hydropower and water conservancy underground engineering
Construction acceptance of underground waterproofing works
Regulations for quality assessment and acceptance of water conservancy communication projects
Water Conservancy and Hydropower Engineering Construction Quality Inspection and Evaluation Regulations
Acceptance assessment of wind farm unit project construction quality
Engineering measurement standard GB 50026-2020
Construction Quality Inspection and Evaluation Regulations for Yellow River Flood Control Projects
Construction Quality Evaluation of Yellow River Flood Control Project
Construction quality acceptance of water conservancy and hydropower projects
Engineering Measurement Standards (GB50026-2020)
Water conservancy and hydropower engineering construction quality inspection and assessment regulations (SL176-2007)
Construction quality acceptance standard of roof waterproofing project
Water conservancy project fire acceptance
Acceptance of electrical equipment for water conservancy projects
Water conservancy and hydropower protection engineering construction
"Engineering Measurement Standards" gb 50026-2020
The latest construction quality acceptance standards for chemical equipment installation projects
Fire protection in water conservancy and hydropower projects
dlt51131-2019 Hydropower and Water Conservancy Construction Unit Project Quality Grade Assessment Standard Form Filling Instructions
nb/t32047 Photovoltaic power station civil construction unit project quality assessment
The latest quality assessment standards for civil construction projects of photovoltaic power stations
Quality acceptance and assessment of power substation projects
Construction appearance quality assessment of water conservancy and hydropower projects
Construction of geomembrane panel dam in hydropower and water conservancy projects
Mechanical and Electrical Engineering Standard List
Construction quality acceptance of permeable pavement projects
sl634-2012

为加强堤防工程施工质量管理,统一堤防工程单元工程施工质量验收评定标准,规范单元工程验收评定工作,制定本标准。本标准适用于1级、2级、3级堤防工程的单元工程施工质量验收评定,4级、5级堤防工程可参照执行。


Scope

This standard is applicable to the construction quality acceptance assessment of unit projects for level 1, level 2, and level 3 embankment projects. Level 4 and level 5 embankment projects can be implemented as a reference.

Sample only — not a preview of SL 634-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • SL 555-2012 in English

    SL 555-2012 in English

    Code for Field Efficiency Test of Small Hydropower Station

    2012-04-05
  • SL 26-2012 in English

    SL 26-2012 in English

    Technical terms in water resources and hydropower project

    2012-01-20
  • SL/Z 549-2012 in English

    SL/Z 549-2012 in English

    Technical guides for audit of water use (for trial implementation)

    2012-07-23
  • SL 159-2012 in English

    SL 159-2012 in English

    Test specification for hydraulic models of gate

    2012-08-06
  • SL 631-2012 in English

    SL 631-2012 in English

    Insptection and Assessment Standard for Separated Item Project Construction Quality of Water Conservancy and Hydroelectric Engineering-Earth-Rock Works

    2012-09-19