SL 763-2018 in English
VALIDTechnical guidelines for water resources argumentation of thermal power plant construction
- Issued on:2018-03-20
- Implemented on:2018-06-20
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$1,080.00
$1,048.00
$1,048.00
Introduction
Analysis of the core content of the standard
| Argumentation module | First-level argumentation requirements | Second-level argumentation requirements |
|---|---|---|
| Reasonableness of water use | Water balance diagram of the whole system + single water use analysis | Water balance analysis of major systems |
| Water intake source | Multi-scheme comparison + risk plan | Feasibility analysis + backup plan |
| Impact of water withdrawal | Cumulative impact + ecological topic | Emission compliance analysis |
Key technical points
Analysis of water rationality
A three-level water balance system needs to be established: whole plant → subsystem → key unit, with key checks on:
- Concentration ratio of circulating cooling system (should be controlled at 4-5 times)
- Auxiliary machine cooling water make-up rate (≤0.5%)
- Water intake per unit of power generation (compare with DL/T5513)
Implementation difficulties and countermeasures
Handling of special situations
Direct current cooling project requires special demonstration:
- Quantitative analysis of ecological base flow impact is required when water intake is >10% of available water supply
- A two-dimensional/three-dimensional diffusion model needs to be established for warm wastewater
- It is strictly forbidden to set up water intakes in fish spawning areas
Analysis of standard evolution
Compared with GB/T35580, this standard highlights:
- Added classification indicators for biomass power generation projects (installed capacity ≥150MW is classified as level one)
- Strengthen the requirements for recycled water utilization (accounting for ≥70% is certified as level one)
- Clarify the material balance verification method for "near-zero emission" projects
Sample only — not a preview of SL 763-2018

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08