SL/T 795-2020 in English
VALIDGuidelines for preparation of comprehensive analysis reports on safe production conditions and facilities of water and hydropower projects
- Issued on:2020-05-15
- Implemented on:2020-08-15
- File Format:PDF
- Delivery:Via email within 5 business days
$408.00
| Standard No: | SL/T 795-2020 |
| Document status: | VALID |
| Title in English: | Guidelines for preparation of comprehensive analysis reports on safe production conditions and facilities of water and hydropower projects |
| Title in Chinese: | 水利水电建设工程安全生产条件和设施综合分析报告编制导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2020-05-15 |
| Implemented on: | 2020-08-15 |
| Professional Classification: | SL-Water Resources |
| Related Keywords: | standard analysis dimensions construction requirements operation requirements identification
comprehensive analysis reports facilities analysis methods safety checklist method special projects preparation unit |
| Related Topics: | comprehensive analysis
analysis report Ministry of Water Resources analysis report hydropower Water ten analysis Guidelines for construction safety management of electric power construction projects sl/t247-2020 |
Introduction
Interpretation of the core content of the standard
| Analysis dimensions | Construction requirements | Operation requirements |
|---|---|---|
| Identification of hazardous factors | 6 scenarios such as construction diversion and interception, main project construction, etc. | 8 major systems such as project site selection, equipment and facilities |
| Analysis methods | Safety checklist method + accident tree analysis (major hazard sources) | |
| Countermeasures | Optimization of overall construction layout | Construction of emergency plan system |
Technology Evolution and Implementation Key Points
Compared with the old version of the specification, this standard adds the Major Hazard Source Classification requirements, and explicitly adopts the GB18218 critical quantity ratio method for quantitative assessment. A typical case is that a hydropower station project identified the cofferdam construction as Level III risk through the LEC method, and the risk level was reduced to an acceptable range after targeted monitoring points were added.
Structured preparation process
- Data collection stage: Need to include 9 types of basic materials such as feasibility study report (Appendix A)
- Focus of on-site investigation: Verify the conformity of natural conditions with the general layout
- Report approval chain: Seal of the preparation unit → Signature of the technical person in charge → Filing of special projects by the construction unit
Special implementation suggestions
For reconstruction and expansion projects, special attention should be paid to:
- The safety status assessment of existing facilities needs to be a separate chapter
- The common engineering hazard sources are marked with red, yellow, blue and green colors
- The investment budget needs to list special safety expenses separately (not less than 2.5% of the total project investment)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08 -

SL 585-2012 in English
Guide for short-circuit current calculation in three-phase AC systems of hydropower engineering
2012-08-06