SL/T 802-2020 in English
VALIDSpecification for cement一chemical compound grouting construction of hydraulic structures
- Issued on:2020-09-25
- Implemented on:2020-12-25
- File Format:PDF
- Delivery:Via email within 10 business days
$1,019.00
| Standard No: | SL/T 802-2020 |
| Document status: | VALID |
| Title in English: | Specification for cement一chemical compound grouting construction of hydraulic structures |
| Title in Chinese: | 水工建筑物水泥化学复合灌浆施工规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 10 business days |
| Issued on: | 2020-09-25 |
| Implemented on: | 2020-12-25 |
| Professional Classification: | SL-Water Resources |
| Related Keywords: | chemical grouting
epoxy resin grouting digital grouting record system hydraulic structures introduction analysis cement slurry recommended chemical slurry fault fracture |
| Related Topics: | chemical carbohydrates
Hydrate grouting hydraulic structures plumber sl/t247-2020 Polymer cement grouting material testing requirements |
Introduction
Analysis of the core content of the specification
This standard establishes a complete set of cement-chemical composite grouting technology system for the anti-seepage reinforcement needs of unfavorable geological bodies in water conservancy projects. The specification emphasizes the grouting principle of cement first, then chemical. The conditions for chemical grouting must be determined through permeability tests. Typical projects require rock permeability ≤1Lu.
Material adaptability requirements
| Geological conditions | Recommended cement slurry | Recommended chemical slurry |
|---|---|---|
| Fault fracture zone | Ultrafine cement | Epoxy resin |
| Weak interlayer | Wet ground fine cement | Polyurethane |
| High permeability formation | Ordinary cement | Acrylate |
Key process control
The working pressure of the high-pressure grouting pump must be 1.5 times greater than the design pressure, and the chemical grouting should adopt the graded pressure-increasing method. A typical case shows that the dam foundation dislocation zone of the Xiluodu Hydropower Station adopts epoxy resin grouting, the pressure is controlled at 3MPa, and the injection rate is continuously ≤0.01L/min.
Quality acceptance standard
- The qualified rate of the curtain grouting contact section is 100%, and the remaining sections are ≥90%
- The permeability value shall not exceed 120% of the design value
- The compressive strength of the core sample shall be increased by more than 30%
Technical innovation and environmental protection requirements
The specification encourages the use of a digital grouting record system, and the chemical grouting waste slurry shall be cured pre-treated and then handed over to a professional organization for disposal. Operators must be equipped with protective masks and chemical-resistant gloves, and VOC concentrations on site must be monitored in real time.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08