SL/T 806-2020 in English
VALIDFundamental technical requirements for pumps of water and hydropower proj ects
- Issued on:2020-11-30
- Implemented on:2021-02-28
- File Format:PDF
- Delivery:Via email within 5 business days
$466.00
Introduction
Interpretation of the core content of the standard
| Technical dimension | Centrifugal pump | Axial flow pump/mixed flow pump | Tube flow pump |
|---|---|---|---|
| Impeller clearance requirement | ≤0.2% impeller diameter | ≤0.15% impeller diameter | ≤0.1% impeller diameter |
| Cavitation reference plane | First stage impeller outlet center | Intersection of blade axis and outer edge | 0.5D below the highest point of the blade |
| Vibration limit (mm/s) | 4.5 (vertical)/2.8 (horizontal) | 3.5 (water guide bearing part) | |
Analysis of key technical requirements
1. Hydraulic performance guarantee: The efficiency of the prototype pump needs to be corrected through model tests, and the correction formula is Δη=(Reproto/Remodel)0.16, where the Reynolds number Re=πDn/ν.
2. Material selection: The sand-containing water flow condition requires a 06Cr13Ni4Mo stainless steel impeller, and the hardness of the flow-through parts must be ≥250HBW.
3. Transition process control: The runaway speed shall not exceed 130% of the rated speed, and the transient pressure fluctuation shall be controlled within ±30% of the design pressure.
Key points for standard implementation
- Factory acceptance must include pressure resistance test (1.5 times the working pressure) and 72-hour continuous operation test
- When the sand content is greater than 1kg/m³, an additional wear life calculation report shall be provided
- Vibration monitoring points shall be arranged at the bearing seat and the inlet and outlet flanges
Standard evolution comparison
Main updates compared to the 2005 version: ①Newly added technical requirements for cross-flow pumps; ②Detailed cavitation margin measurement method; ③Changed vibration evaluation from displacement value to velocity root mean square value.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08 -

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28