Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
transportation pipeline scopethis specification transportation pipeline projects field gathering project construction oilfield gathering current impact test powder spot diameter conversion joint bare blanks
SY 0422-1997 in English

SY 0422-1997 in English

SUPERSEDED

Specification for construction and acceptance of field gathering and transportation pipeline

  • Issued on:1997-12-28
  • Implemented on:1998-06-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $1,000.00
$970.00
Standard No: SY 0422-1997
Document status: SUPERSEDED
Superseded by: GB/T 9711.2-1999 Petroleum and natural gas industries-Steel pipe for pipelines-Technical delivery conditions-Part 2:Pipes of requirements class B
SY/T 0422-2010 Specification for Construction of Oil and Gas Filed Gathering and Transmission Pipeline
Superseded on: 2010-10-01
Title in English: Specification for construction and acceptance of field gathering and transportation pipeline
Title in Chinese: 油田集输管道施工及验收规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 10 business days
Issued on: 1997-12-28
Implemented on: 1998-06-01
ICS Classification: 75.200-Petroleum products and natural gas handling equipment
Professional Classification: SY-Oil & Gas
Related Keywords: transportation pipeline scopethis specification
transportation pipeline projects
field gathering
project construction
oilfield gathering
Related Topics: oilfield
Gathering pipeline
pipeline
lose
Gathering pipeline
Pipeline acceptance
sy 0422
Pipeline acceptance
Pipeline construction acceptance
Construction acceptance
Inspection and acceptance of petrochemical pipeline construction
Construction and acceptance
pipeline construction
Oxygen pipeline construction
Stainless steel pipeline construction and acceptance
Pipeline construction and acceptance
Transmission system construction acceptance
Fiberglass pipe construction and acceptance
The latest version of acceptance specifications for factory and mine road construction
Chemical cleaning construction and acceptance of petrochemical equipment and pipelines
Acceptance standards and specification requirements for pipe jacking construction
Acceptance specifications for lined pipes
Construction acceptance of smoke, air and pulverized coal pipelines
Directional drilling construction pipeline acceptance
Latest version of blind pipe construction specifications
Oilfield pyrotechnics industry
Quality acceptance of directional drilling construction pipelines
Classification of old oil field pipes
Specifications for river construction
Glass pipe construction acceptance
Pipeline acceptance for nuclear facility pipelines
Gathering and transportation pipeline replacement
Oilfield pumping pipe pressure resistance

本规范适用于油田集输管道工程的施工及验收,其适用范围规定如下:1、介质压力不大于32MP;2、介质温度为一20~350度。
本规范不适用于工作压力大于1.6MPa的天然气管道工程施工及验收。


Scope

This specification is applicable to the construction and acceptance of oilfield gathering and transportation pipeline projects. Its scope of application is as follows: 1. The medium pressure is not greater than 32MPa; 2. The medium temperature is -20~350℃; This specification does not apply to natural gas pipelines with a working pressure greater than 1.6MPa. Project construction and acceptance.

Sample only — not a preview of SY 0422-1997
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.