SY 4201.1-2016 in English
VALIDCode for quality acceptance of oil and gas construction engineering.Equipment installation engineering.Part 1: Mechanism and pump
- Issued on:2016-01-07
- Implemented on:2016-06-01
- File Format:PDF
- Delivery:Via email within 5 business days
$1,940.00
| Standard No: | SY 4201.1-2016 |
| Document status: | VALID |
| Title in English: | Code for quality acceptance of oil and gas construction engineering.Equipment installation engineering.Part 1: Mechanism and pump |
| Title in Chinese: | 石油天然气建设工程施工质量验收规范 设备安装工程 第1部分:机泵类 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2016-01-07 |
| Implemented on: | 2016-06-01 |
| ICS Classification: | 75.180-Equipment for petroleum and natural gas industries |
| Chinese Classification: | P93-Mechanical equipment installation engineering |
| Professional Classification: | SY-Oil & Gas |
| Related Keywords: | gas construction engineering.equipment installation
construction quality equipment installation engineering pump equipment natural gas construction projects quality acceptance |
Scope
This specification applies to the acceptance of the construction quality of equipment installation engineering pump equipment in petroleum and natural gas construction projects, including: 1. The overall installation of centrifugal pumps (including oil transfer pump groups), long-axis deep well pumps, submersible pumps for wells, axial flow pumps, gear pumps, screw pumps, reciprocating pumps, etc. 2. The overall installation of reciprocating compressors (groups), centrifugal compressors (groups) and screw compressors (groups). 3. The installation of gas turbine power units with duct-type combustion chambers and horizontal joint surface structures and electric motor power units above 500kW. 4. The installation of centrifugal fans, axial flow fans, centrifugal blowers, axial flow blowers and Roots blowers. 5. The installation of oil pumping units. 6. The installation of vertical agitators for oilfield polymers and dosing devices.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY 4201.4-2106 in English
Specifications for Construction Quality Acceptance of Oil and Gas Construction Projects Equipment Installation Project Part 4: Furnaces
2016-01-07 -

SY/T 0048-2016 in English
Petroleum and natural gas engineering general drawing design specifications
2016-12-05