SY/T 4083-2012 in English
VALIDTechnical Specification for Electric Heat Method of Eliminating Pipeline Welding Residual Stress
- Issued on:2012-08-23
- Implemented on:2012-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$291.00
Scope
This specification is applicable to the residual stress elimination heat treatment of steel pipeline welded joints in oil, gas and refining projects.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY 5494-1992 in English
GHC35 cementing manifold truck
1992-09-17 -

SY/T 5929-1994 in English
Use and maintenance of telemetry seismometers
1994-08-04 -

SY/T 10020-2018 in English
Technical specifications for marine streamer seismic data processing
2018-10-29 -

SY 4030.1-1993 in English
Petroleum construction project quality inspection and assessment standards Electrical engineering (overhead power line engineering)
1993-09-09 -

SY/T 5570-1993 in English
YKZ480 telemetry CNC seismograph
1993-03-27 -

SY/T 10023.1-2020 in English
Method of offshore oiVgas field development project economic evaluation-Part 1:Self-financed offshore oil/gas field
2020-10-23 -

SY/T 5607-1993 in English
Seismic Exploration Data Interpretation Quality Inspection Rules
1993-09-09 -

SY/T 5002-1996 in English
Connection dimensions of wearing parts of double-acting drilling pump
1996-12-25 -

SY 5499-1992 in English
Labor quota for seismic exploration with man-lifted drill in plain area
1992-09-17