SY/T 4114-2008 in English
SUPERSEDEDTechnical specifications for drying construction of gas transmission pipeline
- Issued on:2008-06-16
- Implemented on:2008-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$233.00
本标准规定了天然气输送管道干燥的施工技术要求。
本标准适用于新建、改扩建的天然气输送管道干燥的施工技术。其他介质管道干燥可参照执行。
本标准中干空气干燥法、真空干燥法宜用于管道、站场干燥;氮气干燥法宜用于站场工艺管道干燥;干燥剂干燥法宜用于管道干燥。
Scope
This standard specifies the construction technical requirements for drying natural gas transmission pipelines. This standard applies to the drying construction technology of newly built, renovated and expanded natural gas transmission pipelines. Drying of other media pipelines can be carried out by reference. In this standard, dry air drying method and vacuum drying method should be used for pipeline and station drying; nitrogen drying method should be used for station process pipeline drying; desiccant drying method should be used for pipeline drying.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 4212-2017 in English
Construction quality acceptance specifications for oil and gas construction projects High hydrogen sulfide gas field gathering and transportation station projects
2017-03-28 -

SY/T 4115-2024 in English
Norms for the Preparation of Construction Organization Design for Oil and Gas Pipeline Engineering
2024-09-24 -

SY 4204-2016 in English
Code for quality acceptance of oil and gas construction engineering.Oil-gas field gathering and transportation pipeline engineering
2016-01-07