Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
sand control introduction analysis key design parameters screen sand daily sand content detection formation sand particle size sand ratio > live electrical equipment scopethis standard tailings pond dam design description
SY/T 5340-2020 in English

SY/T 5340-2020 in English

VALID

Practice for gravel pack of sand control

  • Issued on:2020-10-23
  • Implemented on:2021-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $430.00
$418.00
Standard No: SY/T 5340-2020
Document status: VALID
Title in English: Practice for gravel pack of sand control
Title in Chinese: 砾石充填防砂方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2020-10-23
Implemented on: 2021-02-01
Superseding: SY/T 5340-2012 Practice for gravel pack of sand control
Professional Classification: SY-Oil & Gas
Related Keywords: sand control introduction analysis
key design parameters screen sand
daily sand content detection
formation sand particle size
sand ratio >
Related Topics: ptfe filling method
packed column method
filling method
filling
Sand Control Tools
Sand Control Tools
Rubble
sy/t 6916
sandstone analyzer
fill%
column packing method
sand control
Sand filter filling capacity
cemented gravel
gravel
cemented gravel
How to treat both ends of packed columns
sy/t 7494-2020
sy/t 7466-2020
sy/t 7468-2020


Introduction

Analysis of the core content of the standard

Comparison dimensions2012 versionMain changes in the 2020 version
Process classificationNo clear distinction between horizontal well processesNewly added horizontal well forward/reverse filling classification
Definition of terms12 items15 items (5 items such as fracturing filling were added)
Design parametersAppendix A contains 8 formulasOptimize the calculation formula and newly added horizontal well filling rate calculation

Key Technical Points

1. Process Selection Matrix

Recommended processes based on differences in formation conditions:

  • High-density filling (sand ratio>0.5): Applicable to stable formations of vertical/directional wells
  • Fracturing filling: Used when formation sand particle size is <0.1mm or reservoir transformation is required
  • Horizontal well reverse filling: Preferred choice when well section>350m

2. Key Design Parameters

Screen sand retaining accuracy calculation formula:

Fracture type: Dw=2/3×Dg
Pore type: Dp=1/3×Dg

Wherein Dg is the minimum diameter of gravel, thermal recovery wells need to improve their accuracy by 20%


Implementation suggestions

Three stages of quality control

  1. Preliminary verification: tool quality inspection report + liquid compatibility test
  2. Process monitoring: real-time recording of pump pressure curve (fracture filling needs to maintain bottom hole pressure> fracture closure pressure)
  3. Effect evaluation: daily sand content detection within 20 days after production (standard requirement ≤0.03%)

Standard evolution analysis

Main technical upgrades of the 2020 version:

  • Delete the outdated two-step filling procedure and integrate it into a one-step process
  • Add application requirements of thermal compensators in horizontal wells
  • Strengthen HSE management clauses (newly added 10.8 waste liquid recovery specifications)

Sample only — not a preview of SY/T 5340-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend