Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
gravel-packing sand control sand control technology sand control scopethis standard construction quality control gravel pack pond scopethis document direct current transmission lines machine-blown thick-bottomed cups
SY/T 5340-2012 in English

SY/T 5340-2012 in English

SUPERSEDED

Practice for gravel pack of sand control

  • Issued on:2012-01-04
  • Implemented on:2012-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $540.00
$524.00
Standard No: SY/T 5340-2012
Document status: SUPERSEDED
Superseded by: SY/T 5340-2020 Practice for gravel pack of sand control
Superseded on: 2021-02-01
Title in English: Practice for gravel pack of sand control
Title in Chinese: 砾石充填防砂方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-01-04
Implemented on: 2012-03-01
Superseding: SY/T 5181-2000 Recommended practice for gravel pack of sand control of the naked hole
SY/T 5340-2000 Gravel paching method for sand control in cased hole
Professional Classification: SY-Oil & Gas
Related Keywords: gravel-packing sand control
sand control technology
sand control scopethis standard
construction quality control
gravel pack
Related Topics: ptfe filling method
sy/t 6907-2012
packed column method
sy/t+6907-2012
sy/t 6889-2012
filling method
filling
Rubble
sandstone analyzer
fill%
column packing method
sand control
SY/T666.2.1-2012
Sand filter filling capacity
cemented gravel
gravel
cemented gravel
How to treat both ends of packed columns
sy/t5586-2012

本标准规定了裸眼完井、套管完井砾石充填防砂工艺的工程设计、施工准备、施工程序、施工质量控制和安全等内容和技术要求。
本标准适用于裸眼完井和套管完井的直井、定向井砾石充填防砂。
本标准不适用于压裂砾石充填防砂。


Scope

This standard specifies the engineering design, construction preparation, construction procedures, construction quality control and safety of open hole completion and casing completion gravel packing sand control technology and technical requirements. This standard is applicable to gravel-packing sand control for open-hole completions and casing completions of vertical wells and directional wells, but is not applicable to fracturing gravel-packing sand control.

Sample only — not a preview of SY/T 5340-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend