SY/T 5340-2000 in English
SUPERSEDEDGravel paching method for sand control in cased hole
- Issued on:2000-03-10
- Implemented on:2000-10-01
- File Format:PDF
- Delivery:Via email within 5 business days
$835.00
| Standard No: | SY/T 5340-2000 |
| Document status: | SUPERSEDED |
| Superseded by: |
SY/T 5340-2012 Practice for gravel pack of sand control
|
| Superseded on: | 2012-03-01 |
| Title in English: | Gravel paching method for sand control in cased hole |
| Title in Chinese: | 油井套管内砾石充填防砂工艺方法 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2000-03-10 |
| Implemented on: | 2000-10-01 |
| ICS Classification: | 75.020-Extraction and processing of petroleum and natural gas |
| Chinese Classification: | E14-Petroleum extraction |
| Professional Classification: | SY-Oil & Gas |
| Related Keywords: | gravel filling sand control technology
sand control metal wool sand filter tubes cased hole scopethis standard sand |
| Related Topics: | oil well
filling Sand Control Tools Sand Control Tools sy t5281-2000 sy t5281 2000 sand control Petroleum pipes (oil pipes, casings) Sand filter filling capacity cemented gravel Detonator Box Filling Quotes cemented gravel sy/t 5270 2000 |
本标准规定了油井套管内砾石充填防砂工艺防砂前的准备、工程设计、施工程序、施工质量等内容和技术要求。
本标准适用于油井套管内绕丝筛或金属棉滤砂管砾石充填防砂。
Scope
This standard specifies the preparation, engineering design, construction procedures, construction quality, etc. and technical requirements for gravel filling sand control technology in oil well casing. This standard is applicable to gravel filling and sand control in wire-wound screens or metal wool sand filter tubes in oil well casings.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 6464-2016 in English
Technical specifications for horizontal well completion
2016-01-07 -

SY/T 6296-2013 in English
Determination of the Strength of Gels Used for Oil Production - Test Method on Rheological Parameters
2013-11-28