SY/T 5849-2002 in English
SUPERSEDEDThe method for economic effect evaluation of removing plugging by chemicals in production and injection well
- Issued on:2002-05-28
- Implemented on:2002-08-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$117.00
本标准规定了采油井、注水井化学剂常规解堵措施的经济效果评价方法,包括产量评价和经济效益评价方法。
本标准适用于油水井有机解堵、热化学解堵、酸洗解堵、活性水解堵以及复合解堵措施的经济效果评价。
Scope
This standard specifies the economic effect evaluation method of conventional plugging removal measures using chemical agents in oil production wells and water injection wells, including production evaluation and economic benefit evaluation methods. This standard is applicable to the economic effect evaluation of organic plugging removal, thermochemical plugging removal, pickling plugging removal, activated water plugging removal and composite plugging removal measures for oil and water wells.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 6464-2016 in English
Technical specifications for horizontal well completion
2016-01-07 -

SY/T 6675-2007 in English
The calibration methodology of the down hole flow meter gauge
2007-10-08