Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
safety code full-time safety officer specific qualification requirements technical points safety facility configuration specifications safety levels safety valve individual surface contamination helicopter decks guided service robots
SY/T 5985-2020 in English

SY/T 5985-2020 in English

VALID

Safety code of practice for liquefied petroleum gas filling factory (station)

  • Issued on:2020-10-23
  • Implemented on:-
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $180.00
$175.00


Introduction

Interpretation of the core content of the standard

Comparison dimensions Requirements of the 2020 version Differences from the 2014 version
Qualification management Dual requirements of approval from government authorities + filling license required Only permission from the technical supervision department is required
Staffing New technical director (engineer + 3 years of experience) and full-time safety officer Specific qualification requirements are not specified
Inspection cycle Detailed inspection frequency for safety levels 1-4 (ranging from 3-6 years) The inspection cycle is vague

Key technical points

Safety facility configuration specifications

Article 3.3 of the standard clearly requires: The first flange of the storage tank must use a high neck butt welding flange + metal spiral wound gasket combination, and the supporting plugging facilities must match the flange structure. The coverage rate of the combustible gas detection alarm device should reach 100%, and the alarm value setting must meet the 25%LEL lower limit requirements of SY/T 6503.


Implementation suggestions

  1. Qualification upgrade: Complete the license renewal required by the new regulations of TSG 07-2019 before February 2021
  2. Equipment transformation: Focus on checking the anti-collision protection function of the universal filling device
  3. File management: Establish a full life cycle file of special equipment including design documents and inspection records

Typical violation cases

A filling station failed to implement the calibration of scales requirement in clause 4.3.3.3, resulting in an overfill of 2.3kg of YSP-15 gas cylinders, which caused a safety valve tripping accident after being exposed to the sun in summer. According to the standard, weighing scales should be calibrated daily and equipped with an automatic cut-off function.

Sample only — not a preview of SY/T 5985-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend