Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
completion technology screen completion screen completion method completion quality acceptance requirements one-trip string completion operation technical assessment methods tuberculosis information management system diesel engine electronic control valve introductionthis standard
SY/T 6846-2012 in English

SY/T 6846-2012 in English

VALID

Horizontal well completion technology with stage cementing

  • Issued on:2012-01-04
  • Implemented on:2012-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: SY/T 6846-2012
Document status: VALID
Title in English: Horizontal well completion technology with stage cementing
Title in Chinese: 水平井上部注水泥下部筛管完井法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-01-04
Implemented on: 2012-03-01
ICS Classification: 75.020-Extraction and processing of petroleum and natural gas
Chinese Classification: E14-Petroleum extraction
Professional Classification: SY-Oil & Gas
Related Keywords: completion technology
screen completion
screen completion method
completion quality acceptance requirements
one-trip string completion operation
Related Topics: Level 2
sy/t 6907-2012
sy/t+6907-2012
sy/t 6889-2012
horizontal drainage method
horizontal well
Cement sieve
5mpa
groundwater level
horizontal well
screen tube
Sheung Shui
downhole pvt
Completion
horizontal version
up big down flat
cement manhole cover
SY/T666.2.1-2012
Horizontal hose level measurement method
sy/t5586-2012
sy/t6846

本标准规定了水平井上部注水泥下部筛管完井法施工前应取的资料、施工设计、施工准备、施工程序、完井质量验收要求、健康、安全、环境控制等要求。
本标准适用于上部套管用水泥固井、下部以筛管完井为主体的水平井一趟管柱完井作业。


Scope

This standard specifies the information, construction design, construction preparation, construction procedures, completion quality acceptance requirements, health, safety, environmental control and other requirements that should be obtained before the construction of the upper water injection and lower screen completion method of horizontal wells. This standard is applicable to the one-trip string completion operation of horizontal wells in which the upper casing is cemented with cement and the lower part is mainly screen completion.

Sample only — not a preview of SY/T 6846-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend