SY/T 6935-2013 in English
SUPERSEDEDSpecification for Preliminary Design of Liquefied Natural Gas Receiving Terminal
- Issued on:2013-11-28
- Implemented on:2014-04-01
- File Format:PDF
- Delivery:Via email within 5 business days
$815.00
Scope
This standard specifies the requirements for the composition of preliminary design documents for LNG terminal projects, the specific content and depth of engineering design and budget estimates. This standard applies to the preliminary design of new LNG receiving stations. The preliminary design of the expanded and renovated LNG receiving station can be implemented as a reference.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY 7517-1992 in English
Adiabatic calorimetric method for determination of specific heat capacity of crude oil
1992-04-27 -

SY/T 5439-2003 in English
Pneumatic cement-discharging tanker
2003-03-18 -

SY/T 5962-1994 in English
Well washing machine
1994-12-01 -

SY/T 5225-1994 in English
Oil and gas drilling, development, production and storage of fire and explosion safety regulations
1995-01-18 -

SY 5393-1991 in English
Pneumatic automatic drilling device technology
1991-07-19 -

SY/T 6413-2009 in English
Code for computerized logging system operation
2009-12-31 -

SY 6443-1999 in English
Safety regulations for fracturing and acidizing operations
2000-03-31 -

SY/T 5463-1992 in English
Piston pump type and basic parameters for oilfield fracturing
1992-06-30