SY/T 7424-2018 in English
VALIDPetroleum drilling and production equipment. Trailerized drilling and workover rigs
- Issued on:2018-10-29
- Implemented on:2019-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$175.00
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 5972-1994 in English
Drilling foundation selection and calculation
1994-12-01 -

SY/T 4216.3-2018 in English
Code for quality acceptance of oil and gas construction engineering—— Pipeline crossing engineering Part 3:Water areas tunnel crossing
2018-10-29 -

SY/T 5375-1995 in English
Selection method of rotary drilling equipment
1995-12-25 -

SY/T 5087-2017 in English
Hydrogen sulfide environment drilling workplaces safety norms
2017-03-28 -

SY/T 5850-1993 in English
Sulfonated asphalt for drilling fluid (paste)
1993-11-16 -

SY/T 5812-1993 in English
Annulus test wellhead
1993-09-09 -

SY 5855-1993 in English
Investigation and Handling Procedures for Employee Casualties in Petroleum Enterprises
1994-01-06 -

SY/T 5607-1993 in English
Seismic Exploration Data Interpretation Quality Inspection Rules
1993-09-09