SY/T 7635-2021 in English
VALIDSpecification for process design of subsea oil pipeline
- Issued on:2021-11-16
- Implemented on:-
- File Format:PDF
- Delivery:Via email within 1~3 business days
$156.00
Introduction
Analysis of the core content of the standard
SY/T 7635-2021, as the industry standard for the process design of submarine oil pipelines in my country, systematically regulates the technical requirements for the entire process from pipe diameter selection to pipe cleaning operations for the first time. This standard particularly emphasizes the differentiated design principles for high-freezing crude oil and heavy oil pipelines.
Comparative Analysis of Key Technologies
| Design Links | Requirements for Conventional Crude Oil | Special Requirements for High Pour Point/Heavy Oil |
|---|---|---|
| Insulation Design | Maintain Operating Temperature | Needs to be 3-5℃ higher than the pour point and consider wax precipitation characteristics |
| Stop and Replacement | Non-essential Operation | Media Replacement Must be Completed within the Safe Stop Time |
| Start-up Procedure | Direct Start | Preheating is Required and Shear Failure Analysis Is Required |
Key Points for Implementation of the Standard
1. Optimization of pipe diameter selection
According to clause 5.2 of the standard, it is recommended to adopt a multi-objective optimization algorithm, while considering:
- Economic flow rate range (1-3m/s)
- Water hammer pressure limit (Appendix B formula)
- Future 20% flow margin
2. Innovation in insulation design
Clause 4.9 of the standard first proposed the application requirements of new insulation materials. A Bohai oilfield project used a nano aerogel insulation layer, and the overall heat transfer coefficient was reduced by 40%, verifying the forward-looking nature of the standard.
Industry application suggestions
- Digital delivery: It is recommended to establish a three-dimensional design model that includes crude oil physical properties (Appendix A) and sea condition data
- Emergency drills: In response to Article 5.7.5, replacement operation simulations need to be performed regularly to test the emergency power supply system
- Pig cleaning optimization: In combination with Article 5.10.3, it is recommended to use a wax deposition monitoring system to dynamically adjust the pigging frequency
Standard evolution analysis
Compared with GB 50253-2014 land pipeline standard, this version has the following major breakthroughs:
- Added a new mud temperature influence coefficient unique to the seabed environment (Article 4.4)
- Unique heavy oil cold start calculation formula (Appendix D)
- Clearly define the speed control range of the intelligent pig (1-3m/s)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 89-1995 in English
Calcined x-type alumina
1995-04-06 -

SY 5157-1991 in English
digital seismometer
1991-07-19 -

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 5716.2-1995 in English
Oil drilling rig overhaul technical conditions crown block, traveling block, hook
1995-07-13 -

SY 5210-1991 in English
Well repair faucet
1991-11-20 -

SY/T 4069-1993 in English
Petroleum Construction Quality Inspection and Evaluation Standards oilfield steel container production (with the provisions stated)
1993-09-09 -

SY/T 7504-1994 in English
Gas Chromatography for Analysis of n-Octane and Previous Hydrocarbon Components in Crude Oil
1994-12-21 -

SY 5855-1993 in English
Investigation and Handling Procedures for Employee Casualties in Petroleum Enterprises
1994-01-06 -

SY/T 7370-2017 in English
Recommended practice for selection and design of the injection-production tubing string in underground gas storage well
2017-03-28 -

SY/T 5538-1992 in English
Technical regulations for measurement of current status map of oil and gas transmission pipelines
1992-11-03