Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
durability test requirements durability test add test benchmark durability requirements none performance retention railway car piston retarder introduction background new test equipment indirect discharge test method four-blade end face shell composite furniture components
TB/T 2460-2016 in English

TB/T 2460-2016 in English

VALID

Railway car piston retarder

  • Issued on:2016-08-16
  • Implemented on:2017-02-16
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $320.00
$311.00
Standard No: TB/T 2460-2016
Document status: VALID
Title in English: Railway car piston retarder
Title in Chinese: 铁道车辆减速顶
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2016-08-16
Implemented on: 2017-02-16
Superseding: TB/T 2460-2009 Railway Car Piston Retarder
Professional Classification: TB-Railway Transport
Related Keywords: durability test requirements
durability test
add test benchmark durability requirements none performance retention
railway car piston retarder introduction background
new test equipment
Related Topics: tb/t 1961-2016
tb/t3441-2016
tb/t3367-2016
tb/t2993.5-2016
tb/t3440-2016
tb/t 3466-2016
tb/t 3432-2016


Introduction

Background of Standard Revision and Technological Evolution

TB/T 2460-2016, as the latest industry standard for railway vehicle retarder, replaces the 2009 edition of the standard. This revision mainly responds to the following technological development needs:

  • Material technology progress: New low-temperature performance requirements for hydraulic oil pour point (≤-15℃) and freezing point (≤-18℃)
  • Test method optimization: Introduce new detection methods such as straight-track simulation test bench
  • Reliability improvement: Add 80,000 rounds of durability test requirements, and delete the original seal life indicator

Core parameter comparison analysis

Technical indicators TB/T 2460-2009 TB/T 2460-2016 Range of change
Critical speed deviation (≤1.25m/s) Grade requirements Uniformly set to ±0.14m/s Simplified classification
Braking work (inside) Undefined height benchmark ≥850J (58mm stroke) Add test benchmark
Durability requirements None Performance retention for 80,000 cycles Add key indicators

Technical requirements for key components

Sliding cylinder assembly

As a core brake component, the new standard requires:

  1. No coating peeling (Clause 5.12)
  2. Middle outer diameter wear ≤0.09mm (durability test)
  3. No bubbles in inverted seal test (Clause 5.6)

Shell

Installation support components must meet the following requirements:

  • Inner diameter wear ≤0.50mm (Clause 10.10.c)
  • Red painting is prohibited (Clause 5.11)
  • Gap requirements: 2-8mm on the inside, 1-4mm on the outside (Clause 5.15)

Test method innovation

The 2016 version of the standard significantly improved the detection system:

New test equipment

Added a straight-track simulation test bench (Clause 6.1.1.2), with the following requirements:

  • Wheel weight ≥ 5t (Clause 6.1.2.1.2)
  • Speed fluctuation < 3% (Clause 6.1.2.4.2)

Critical speed calculation formula

Introduced precise calculation model (Clause 6.1.4):

Δuh = ush - uz (upper deviation) Δuz = uz - uxl (lower deviation) uz = (ush + uxl)/2 (median value)

Implementation suggestions

  1. Model matching: Select the critical speed nominal value according to the line conditions (1.25-5.0m/s optional)
  2. Installation specification: Ensure the inner installation height tolerance of ±1mm (6.1.2.3 clause)
  3. Maintenance cycle: It is recommended to check the wear of the sliding cylinder every 50,000 cycles
  4. Winter protection: In cold areas, hydraulic oil with a pour point 15°C lower than the ambient temperature should be used

Sample only — not a preview of TB/T 2460-2016
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend