TB/T 3205.2-2016 in English
SUPERSEDEDTrack lead, connectors for impedance bond. Part 2: Midpoint connecting line
- Issued on:2016-11-18
- Implemented on:2017-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$175.00
Scope
This part specifies the product classification, technical requirements, test methods, inspection rules, marking, packaging, transportation and storage of choke transformer midpoint connecting wires (hereinafter referred to as connecting wires). This section applies to the design, production, manufacturing and inspection of connecting lines between the midpoints of two choke transformers and between the midpoints of a single choke transformer and the rails in electrified section track circuits.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

TB/T 2872-1998 in English
Test method for compatibility of filter element materials and fluids for diesel locomotives
1998-02-24 -

TB/T 2895-1997 in English
Turnout conversion resistance adhesion force
1997-04-10