Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
closing mechanism automatic mechanism front hatch mechanism manual mechanism mechanism hf broadcasting anti-caking powdery pipeline introductionthis standard
TB/T 3458-2016 in English

TB/T 3458-2016 in English

VALID

Front hatch mechanism of EMU/DMU

  • Issued on:2016-09-30
  • Implemented on:2017-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: TB/T 3458-2016
Document status: VALID
Title in English: Front hatch mechanism of EMU/DMU
Title in Chinese: 动车组前面端开闭机构
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2016-09-30
Implemented on: 2017-04-01
Professional Classification: TB-Railway Transport
Related Keywords: closing mechanism
automatic mechanism
front hatch mechanism
manual mechanism
mechanism
Related Topics: tb/t 1961-2016
front end
tb/t3441-2016
tb/t3367-2016
tb/t2993.5-2016
Front-end circuit
tb/t3440-2016
EMU front end opening and closing mechanism
Open and close joints
tb/t 3466-2016
tb/t 3432-2016


Introduction

Analysis of the core content of the standard

This standard specifies the technical requirements for the full life cycle of the front-end opening and closing mechanism of EMUs, with the focus on:

  • Dual-bearing structure design: two load-bearing schemes: metal frame and fiberglass
  • Operation mode classification: automatic mechanism (≤30s to complete the action) and manual mechanism (≤5min operation)
  • Adaptation to extreme environments: -40℃~+40℃ operating temperature range

Comparison of key technical indicators

Parameter category Metal frame type Fiberglass type Test standard
Longitudinal compression load ≥10kN - Clause 6.5
Vibration shock level Determined by negotiation IEC 61373 Class 1 Level A Clause 6.9
Material strength As per drawing Tensile ≥100MPa
Bending ≥150MPa
Clause 6.11

Key requirements for electrical system

The electrical system of the automatic opening and closing mechanism must meet the following requirements:

  1. Insulation resistance classification: high voltage circuit ≥5MΩ, low voltage circuit ≥1MΩ
  2. Protection level: IP65 waterproof and dustproof
  3. Withstand voltage test: 1500V/1min (AC225V and above system)

Typical case: A certain type of EMU adopts dual redundant position sensor to ensure 100% reliable transmission of opening and closing state signals.


Standard evolution background

As the speed of EMU increases to 200km/h+, traditional opening and closing mechanisms face:

  • Pneumatic load increases by more than 50%
  • Electrical system electromagnetic compatibility issues become prominent
  • Requirements for extreme climate adaptability increase

This standard clarifies the quantitative indicators of FRP materials for the first time, filling the application gap of composite materials.


Implementation suggestions

  1. New vehicles: give priority to automatic opening and closing mechanisms, and reserve manual emergency interfaces
  2. Inspection and maintenance: focus on the oxidation of electrical contacts (5,000km inspection cycle is recommended)
  3. Material selection: -40℃ grade fiberglass formula is recommended for high-cold lines

Sample only — not a preview of TB/T 3458-2016
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend