Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
railway line introduction interpretation concrete components metal concrete strength years dimensional deviation ±2.0mm ±2.5mm ±20mm anti-corrosion treatment concrete years process control utility-interconnected photovoltaic test method system three types single-flow compressors
TB/T 3522-2018 in English

TB/T 3522-2018 in English

VALID

Protection fence for railway line

  • Issued on:2018-07-31
  • Implemented on:2019-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $130.00
$127.00
Standard No: TB/T 3522-2018
Document status: VALID
Title in English: Protection fence for railway line
Title in Chinese: 铁路线路防护栅栏
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-07-31
Implemented on: 2019-02-01
Professional Classification: TB-Railway Transport
Related Keywords: railway line introduction interpretation
concrete components metal
concrete strength
years dimensional deviation ±2.0mm ±2.5mm ±20mm anti-corrosion treatment concrete
years process control
Related Topics: route
grid
column
China Railway
China Railway
line measuring line
railway anti-vibration
railway line
Railroad Fence
the fence
line
gb4053.3-2016 guardrail
TB/T 3474.2-2018
Railway line overhaul acceptance
tb/t3539-2018


Introduction

Interpretation of the core content of the standard

This standard systematically stipulates the technical requirements for the entire life cycle of railway protective fences, with the focus on:

  • Material specifications: concrete strength ≥ C30, metal mesh galvanizing amount 270g/m²
  • Durability indicators: reinforced concrete components ≥ 30 years, metal mesh ≥ 15 years
  • Process control: welding point shedding rate <4%, mesh deviation ±3.0mm

Comparison of key technical indicators

Project Reinforced concrete components Metal mesh Barbed wire cage
Service life ≥30 years ≥15 years 8-10 years
Dimensional deviation ±2.0mm ±2.5mm ±20mm
Anti-corrosion treatment Concrete protective layer Hot-dip plastic ≥0.4mm Galvanized 120/270g/m²

Material selection specification

4.2.1 Concrete raw materials

Cement is used>42.5 grade silicate cement, coarse aggregate is 5-16mm continuous graded crushed stone, water-cement ratio ≤0.40. Special attention:

  • Chloride ion content ≤0.06%
  • Sulfur trioxide content ≤4.0%
  • Frost resistance grade ≥F250

4.2.6 Steel requirements

The steel bar is HPB300/HRB335 grade, the barbed wire core is φ6.5mm high wire, and the blade is 0.5mm thick Q195 steel plate.


Main points of manufacturing process control

4.3.3 Concrete pouring

Key parameter control:

  1. Pouring time of single component≤20 minutes
  2. Formwork temperature5-35℃
  3. Mold temperature5-30℃

4.3.6 Welding requirements

Tensile strength of mesh welding point>1kN, resistance welding process is adopted, and the following shall be carried out after welding:

  • Weld slag cleaning
  • Deformation correction
  • Flatness detection

Quality inspection system

6.1 Type inspection

Trigger conditions include:

  • New production line put into operation
  • Resume production after 6 months of suspension
  • Major changes in materials/processes

6.2 Factory inspection

Required inspection items for each batch:

Appearance dimensions 10% sampling
Concrete strength 3 specimens per group
Elastic modulus 1 group for every 10 batches

Implementation suggestions

7.2 Storage specifications

Component storage requirements:

  • Handrail ≤10 layers, 6 pads/layer
  • Columns ≤ 5 layers, 3 pads/layer
  • The cover can be removed only when the ambient temperature difference is ≤15℃

Special environmental response

For saline-alkali/freeze-thaw areas:

  1. Galvanizing amount increased to 270g/m²
  2. Add preservatives to concrete
  3. Add chloride ion diffusion coefficient detection

Sample only — not a preview of TB/T 3522-2018