Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
water system inspection management gas system inspection management air system inspection management construction project commencement procedures inspection management urban public security traffic command system pressure-sensitive tapes scopethis standard sugarcane planter scopethis standard
T/CSPSTC 26-2019 in English

T/CSPSTC 26-2019 in English

VALID

Guidelines for construction of thin film solar cell factory

  • Issued on:2019-08-28
  • Implemented on:2019-11-15
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: T/CSPSTC 26-2019
Document status: VALID
Title in English: Guidelines for construction of thin film solar cell factory
Title in Chinese: 薄膜太阳能电池工厂建设指南
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2019-08-28
Implemented on: 2019-11-15
ICS Classification: 27.160-Solar energy engineering
Professional Classification: T/-Social Organization Standard
Related Keywords: water system inspection management
gas system inspection management
air system inspection management
construction project commencement procedures
inspection management
Related Topics: Solar battery
All-weather solar battery
organic solar battery
Solar battery
factory
Space Plant Factory
solar current
Thin Film Measurement Guide
film sun
Non-rolling film battery
artificial battery film
Ding Liming Organic Solar Cells
production of solar cells
film factory
new solar cell
space factory
Membrane battery Membrane battery
High Efficiency Thin Film Battery
solar cell method
Thin film battery testing
film sun
solar cell ultraviolet
Film property measurement equipment
Solar Cell Test
Film property measurement equipment
thin film cell
Solar cells for space
solar panels in space
solar panels in space
solar cell 22
organic and inorganic solar cells
Brominated organic solar cells
Inorganic solar cells
Solar cell output voltage
new solar cell
solar panels, solar energy
Thin Film Solar Cell Factory Design
"Silicon Solar Cell Factory Design Specifications"
film
The difference between photodetectors and solar cells
Solar cell parameters
Solar cell electrical performance parameters
cdte thin film solar cell back electrode
Thin Film Solar Investment
EQE solar cells
Thermochromic solar cells
Silicon solar cell factory design
ossila solar cell iv test system
Solar cell execution
Solar cell quality execution
Factory gas bottle room construction
Solar wafer factory
Solar cell testing
t/cspstc44-2019
solar cell energy


Scope

主要内容包括以下部分:
一、工厂建设管理模式
A、工厂建设模式
The construction mode of the factory can be categorized into self-built and delegated modes based on different construction subjects.
Self-built mode refers to a joint venture between the government and enterprises for factory projects, where the project company organizes and completes the entire engineering construction process.
Delegated construction mode involves a joint venture between the government's platform company and enterprises. During the construction period, it is handled by a delegated company from the platform company, which constructs the factory according to the design drawings provided by the project company; after the engineering passes inspection and meets national and industry standards (90 days), it will be handed over for use once its functions are confirmed.
B、工厂工程承包模式
It is recommended that the construction of the factory adopt an integrated engineering contracting model. Under this mode, the owner entrusts the entire project to a contractor who is responsible for designing, purchasing materials, and constructing the building. The contractor will ensure the progress, quality, safety, schedule, and cost of the construction. Ultimately, they will deliver a completed and inspected project that meets contract requirements and usage standards.
Project consultancy services should also be engaged during the construction process due to the specialized nature of large-scale cleanrooms in factory projects.

二、工厂选址要求
The selection of a factory site includes both site environmental requirements and basic infrastructure requirements (7 utilities and leveling).
Site environmental requirements include:
a) Site leveling;
b) Area requirements;
c) Water supply and drainage requirements;
d) Natural gas requirements;
e) Electrical requirements;
f) Water environment requirements;
g) Requirements for the recycling of hazardous materials;
h) Noise environment requirements;
i) Other.
Basic infrastructure requirements (7 utilities and leveling) refer to specific construction planning requirements, including:
a) Road access
b) Water supply
c) Drainage
d) Electricity
e) Communication
f) Gas supply
g) Hot water supply
h) Site leveling

(4) 工厂报批报建流程
The approval and registration process for the factory can follow the following sequence:
a) Project initiation procedures;
b) Procedures for obtaining a state-owned land use certificate;
c) Procedures for obtaining a construction land planning permit;
d) Procedures for obtaining a construction engineering planning permit;
e) Drawing review procedures;
f) Tendering and bidding procedures;
g) Construction project commencement procedures;
h) Environmental impact assessment procedures;
i) Energy consumption evaluation procedures;
j) Safety/occupational health evaluation procedures;
k) Fire safety approval procedures;
l) Other.

(5) 工厂开工条件
The factory can commence construction after the following conditions are met:
a) Feasibility study of the project;
b) Project signing;
c) Site selection;
d) Formation of a project team;
e) Project filing;
f) Obtaining a construction engineering planning permit;
g) Tendering and bidding;
h) Signing contracts for process equipment procurement;
i) Signing financing agreements;
j) Processing land procedures;
k) Design of construction drawings;
l) Environmental impact, safety, energy consumption, occupational health, and fire safety reviews;
m) Obtaining a construction permit.

(6) 施工及变更管理
The management of the construction and change process can include:
a) Quality management;
b) Schedule management;
c) Safety management;
d) Change management procedures.

(7) 工厂验收管理
Management of factory acceptance can include:
a) Structural inspection management;
b) Interior decoration inspection management;
c) Air system inspection management;
d) Gas system inspection management;
e) Water system inspection management;
f) Chemical material supply system inspection management;
g) Electrical distribution system inspection management;
h) Automation control system management;
i) Equipment installation acceptance management;
j) Fire protection system acceptance management;
k) Anti-static facility acceptance management;
l) Engineering inspection management;
m) Clean room acceptance management.

Sample only — not a preview of T/CSPSTC 26-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.