Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
engineering mud engineering mud scopein order technical standard engineering standard specific dose measurement systems mechanical fasteners bile management
T/TJKCSJ 004-2022 in English

T/TJKCSJ 004-2022 in English

VALID

Technical standard for solidification and utilization of engineering mud

  • Issued on:2022-08-31
  • Implemented on:2022-09-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $670.00
$650.00
Standard No: T/TJKCSJ 004-2022
Document status: VALID
Title in English: Technical standard for solidification and utilization of engineering mud
Title in Chinese: 工程泥浆固化利用技术标准
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2022-08-31
Implemented on: 2022-09-01
Professional Classification: T/-Social Organization Standard
Related Keywords: engineering mud
engineering mud scopein order
technical standard
engineering
standard
Related Topics: Technology software technology standardization
t/tjkcsj003-2022
t/wllt 004-2022
t/cfgiia 004-2022
t/capid 004-2022
t/cnida 004-2022


Scope

In order to utilize engineering mud (slurry containing slag) as a resource, and at the same time solve the problems of poor backfilling in construction projects and municipal projects, high cost of filling materials in caves and other underground spaces, and insufficient liquidity, the preparation team conducted in-depth investigation and research, combined with Tianjin This standard was formulated based on the actual situation of the city and my country, with reference to advanced standards at home and abroad, and on the basis of extensive solicitation of opinions.

Sample only — not a preview of T/TJKCSJ 004-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend