YC/T 198.3-2012 in English
VALIDSpecification of quality assurance for cooperating production of cigarette brand—Part 3:Batch test and preparation of documents
- Issued on:2012-03-23
- Implemented on:2012-04-15
- File Format:PDF
- Delivery:Via email within 1~3 business days
$175.00
YC/T198的本部分规定了卷烟品牌合作生产批量试验的启动条件、准备要求、试验过程要求、试验结果评价要求、批量试验报告及判定要求、文件编制要求。
本部分适用于卷烟品牌合作生产的批量试验与文件编制。
Scope
This part of YC/T 198 stipulates the starting conditions, preparation requirements, test process requirements, test result evaluation requirements, batch test report and judgment requirements, and document preparation requirements for cigarette brand cooperative production batch tests. This section applies to batch testing and documentation for cigarette brand cooperative production.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

YC/T 636-2025 in English
Quality Traceability in the Production Process of Leaf Beating and Re-drying: General Principles and Basic Requirements
2025-06-30 -

YC/T 18-1994 in English
Tobacco leaf redrying production process regulation
1994-08-23 -

YC/T 620-2024 in English
Tobacco Retail Customer Satisfaction Survey Standard
2024-09-03 -

YC/T 569-2018 in English
Tobacco field operation machinery selection and testing procedures
2018-12-17 -

YC/T 9-2015 in English
Cigarette factory design specification
2015-10-21