YD/T 1663-2007 in English
VALIDTesting Methods for Bearer Independent Call Control
- Issued on:2007-07-20
- Implemented on:2007-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$990.00
| Standard No: | YD/T 1663-2007 |
| Document status: | VALID |
| Title in English: | Testing Methods for Bearer Independent Call Control |
| Title in Chinese: | 与承载无关的呼叫控制(BICC)测试方法 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2007-07-20 |
| Implemented on: | 2007-12-01 |
| ICS Classification: | 33.040.30-Switching and signalling systems |
| Chinese Classification: | M12-Communication network number, signal and connection |
| Professional Classification: | YD-Telecommunication |
| Related Keywords: | bearer independent call control
call bearer control independent |
| Related Topics: | The relationship between measurement and control
Carrier gas control control test control test YD/T 1663-2007 YD/T 5149-2007 YD/T 5150-2007 YD/T 5152-2007 YD/T 5154-2007 YD/T 5155-2007 YD/T 5161-2007 yd/t5151-2007 |
本标准规定了与承载无关的呼叫控制(BICC)协议在基本业务,包括CIC监视、正常的呼叫建立、正常的呼叫释放、不成功的呼叫建立、呼叫期间的异常情况、特殊呼叫的建立、承载业务、承载建立、承载释放、编解码协商、编解码修改、呼叫中的编解码协商、DTMF信号带外传送等方面的测试方法。本标准适用于与承载无关的呼叫控制(BICC)协议。

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

YD/T 913-1997 in English
Digital subscriber signalling system No.1(DSS1)-typical DSS1 service indicator codings for ISDN telecommunications services
1997-12-02 -

YD/T 4158-2022 in English
Technical requirements of network interworking for number portability
2022-09-30 -

YD/T 1522.31-2009 in English
Technical Requirements for Session Initiation Protocol Part 3 Interworking between ISUP and SIP-Supplement 1
2009-06-15 -

YD/T 1662-2007 in English
Testing Methods for National No.7 Signalling System——GSM Mobile Telephone User Part (MTUP)
2007-07-20 -

YD/T 1918-2009 in English
Test Methods for the Adaptation Layer of ISDN Signalling Interworking with IP
2009-06-15