Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
limited concentrations 进出口锰矿石中铁、铝、镁、钙、钛、磷、镍、铜、锌的测定 电感耦合等离子体原子发射光谱法 scopethis part tobacco industry monopoly cases
YD/T 4591-2023 in English

YD/T 4591-2023 in English

VALID

Product security assessment management systemCybersecurity emulationtechnical requirements

  • Issued on:2023-12-29
  • Implemented on:2024-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $310.00
$301.00
Standard No: YD/T 4591-2023
Document status: VALID
Title in English: Product security assessment management systemCybersecurity emulationtechnical requirements
Title in Chinese: 网络空间安全仿真 产品安全测评管理系统技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2023-12-29
Implemented on: 2024-07-01
Professional Classification: YD-Telecommunication
Related Topics: product Safety
evaluation
cyberspace security
test agent
Safety Evaluation
product evaluation
Evaluation Standards
Evaluation system
Cyberspace
Simulation sample box
Safety management during the 14th Five-Year Plan period
Product Safety Supervision System
Measurement Space Network
Simulation verification technical requirements
Security product capability evaluation

本文件规定了在网络空间安全仿真环境中对于安全产品、网络产品和主机产品进行安全方面的自动化在线测评的系统的技术要求。
本文件适用于指导网络空间安全仿真环境中的产品安全自动在线测评系统的设计、开发、建设、部署及检测,其他场景下的产品安全测评管理系统也可参考使用。


Introduction

Analysis of the core content of the standard

Functional modules Core requirements Technical implementation
Assessment resource management Support dynamic allocation of resources such as test instruments and agents Resource pooling + intelligent scheduling algorithm
Automatic execution of assessment Concurrent task isolation and automatic topology construction SDN technology + containerized isolation
Security audit Full operation log recording and tamper-proof Blockchain evidence storage technology

Detailed explanation of key technical requirements

5.1 Assessment resource management

The system needs to implement full life cycle management of resources such as Linux/Windows servers, network devices, and test agents, including:

  • Resource discovery: Automatically identify available devices in the simulation environment
  • Status monitoring: Real-time collection of CPU/memory/interface occupancy
  • Dynamic drive: Remote call of test tools through API

6.4 Intrusion prevention

The standard requires the establishment of a unified patch management mechanism. A provincial assessment center implemented this case:

  1. Using Nessus for vulnerability scanning
  2. Central distribution of patches through WSUS server
  3. Critical system patch installation success rate≥99.5%

Standard Evolution Analysis

Compared with traditional evaluation methods, this standard highlights three major innovations:

Dimensions Traditional mode Requirements of this standard
Test efficiency Manual use case execution Full process automation
Environment construction Physical topology adjustment SDN dynamic networking
Result credibility Manual report preparation Blockchain evidence

Implementation suggestions

Construction path planning

  1. Basic stage: Deploy core tools such as Metasploit and Nmap
  2. Integration stage: Develop test process engine and report generation module
  3. Optimization stage: Introduce AI-driven use case recommendation algorithm

Common risk avoidance

  • Test resource conflict: It is recommended to adopt time slice round-robin scheduling
  • Topology configuration error: Establish a virtual network template library
  • Audit log is too large: Implement a tiered storage strategy

Sample only — not a preview of YD/T 4591-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend