Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

stress test time

stress test time, Total:80 items.

The international standard classification for "stress test time" includes: Protection against dangerous goods , Power stations in general , Rubber , Aircraft and space vehicles in general .

The Chinese standard classification for "stress test time" includes: Marking, packaging, transport and storage in general , Electric power system , Rubber products in general , Engine , Technical Management .


General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Military Standard of the People's Republic of China-General Armament Department

  • GJB 736.16A-2019 Test methods for pyrotechnics Part 16: Determination of ignition pressure-time curve
  • GJB 736.16-1994 Pyrotechnics Test Method Ignition Pressure-Time Curve Determination
  • GJB 3597-1999 Frequency Agility Time Test Method
  • GJB 5309.24-2004 Test methods for pyrotechnics Part 24: Determination of ignition pressure-time curve

Professional Standard - Aerospace

  • QJ 1047-1986 Solid rocket motor pressure-time, thrust-time data processing specification
  • QJ 1047-1992 Data Processing Specifications for Pressure - Time and Thrust - Time of Solid Rocket Engine

Professional Standard - Military and Civilian Products

  • WJ/Z 201-1984 Piezoelectric fuze action time (piezoelectric mechanism-electric detonator) simulation test method
  • WJ/Z 384-1995 Processing time quota for powerful spinning of rockets

Professional Standard - Electron

  • SJ 443-1973 Method of measurement for cathode heating time of high-voltage rectifier tubes

Henan Provincial Standard of the People's Republic of China

Professional Standard - Commodity Inspection

  • SN/T 3054.1-2011 Test Method of Explosivity for Import Solid Waste Materials. Part 1: Time/Pressure Test

Group Standards of the People's Republic of China

Professional Standard - Medicine

Professional Standard - Chemical Industry

  • HG/T 3843-2008 Vulcanized rubber - Test method for short time static compression
  • HG/T 3843-2006 Vulcanized rubber; Testing short time static compression

Professional Standard - Post and Telecommunication

German Institute for Standardization

  • DIN 53769-3:1988 Testing of glass fibre reinforced plastics pipes; determination of initial and long-term ring stiffness
  • DIN 53758:1975 Testing of plastics articles; determination of the effect of internal pressure on hollow objects by short-time test
  • DIN 53759:1975-02 Testing of plastics articles; determination of the effect of internal pressure on hollow objects by long-time test
  • DIN 53759:1975 Testing of plastics articles; determination of the effect of internal pressure on hollow objects by long-time test
  • DIN 51226:1977 Material testing machine Metal tensile stress long time creep testing machine
  • DIN 53465:1963-04 Testing of Plastics; Determination of the Closing Time of Thermosetting Compression Moulding Materials
  • DIN EN 60645-3:1995 Electroacoustics - Audiometric equipment - Part 3: Test signals of short duration
  • DIN 10970:2002-09 Sensory analysis - Time intensity test

Gosstandart of Russia

  • GOST 265-1977 Rubber. Methods of short static compression tests

Magyar Szabványügyi Testület

Fondo para la Normalización y Certificación de la Calidad Venezuela, République bolivarienne du

  • NORVEN 540 P 1971 Put different pressures on the safe or chamber to test its protection level

Bureau of Indian Standards

  • IS 4592-1968 Gap frame press test chart
  • IS/IEC 60645-3-2020 Electroacoustics-Audiometric Equipment - Part 3 Test Signals of Short Duration
  • IS 13867-1993 Rubber. Standard temperatures, humidities and times for the conditioning and time interval between vulcanization and tersting of test pieces
  • IS 2183-1973 Schedule for high pressure mercury vapour lamps

National Standardisation Body (ASRO)

  • STAS SR ISO 3503:1995 Assembled joints between fittings and polyethylene (PE) pressure pipes-Test of leakproofness under internai pressure when subjected to bending

American Society for Testing and Materials (ASTM)

  • ASTM RR-E28-1034 2009 E0292-Test Methods for Conducting Time-for-Rupture Notch Tension Tests of Materials
  • ASTM D5483-20 Standard Test Method for Oxidation Induction Time of Lubricating Greases by Pressure Differential Scanning Calorimetry
  • ASTM D5483-02 Standard Test Method for Oxidation Induction Time of Lubricating Greases by Pressure Differential Scanning Calorimetry
  • ASTM D5483-21 Standard Test Method for Oxidation Induction Time of Lubricating Greases by Pressure Differential Scanning Calorimetry
  • ASTM RR-D02-1025 1976 D3520- Test Method for Quenching Time of Heat-Treating Fluids (Magnetic Quenchometer Method)

GM Europe

Standard Association of Australia (SAA)

  • AS 1774.34:2004 Refractories and refractory materials - Physical test methods - Guide to the determination of extrusion pressure and curing time of taphole clay

Swedish Institute for Standards

US Federal Contractor Registration (USFCR)

American Association of State Highway and Transportation Officials

Spanish Association for Standardization (UNE)

  • UNE 52 003 Determination of working time, standard time and time types
  • UNE-EN IEC 60645-3:2020 Electroacoustics - Audiometric equipment - Part 3: Test signals of short duration (Endorsed by Asociación Española de Normalización in January of 2021.)
  • UNE-EN IEC 62271-108:2020 Electroacoustics - Audiometric equipment - Part 3: Test signals of short duration (Endorsed by Asociación Española de Normalización in January of 2021.)

Society of Automotive Engineers (SAE)

Czech Standards Institute (UNMZ)

British Standards Institution (BSI)

  • BS EN 60645-3:1995 Audiometers-Auditory test signals of short duration for audiometric and neuro-otological purposes
  • BS 4550-3-3.6:1978 Methods of testing cement. Physical tests-Test for setting times
  • 18/30376570 DC BS EN 60645-3. Electroacoustics. Audiometric equipment. Part 3. Test signals of short duration

Japanese Industrial Standards Committee (JISC)

  • JIS B 8419:2010 Pneumatic fluid power -- Directional control valves -- Measurement of shifting time and response time

Comitato Elettrotecnico Italiano

GCC Standardization Organization

Korean Agency for Technology and Standards (KATS)

Danish Standards Foundation

International Organization for Standardization (ISO)

  • ISO 3503:1976 Assembled joints between fittings and polyethylene (PE) pressure pipes; Test of leakproofness under internal pressure when subjected to bending
  • ISO 3503:2015 Plastics piping systems - Mechanical joints between fittings and pressure pipes - Test method for leaktightness under internal pressure of assemblies subjected to bending

(U.S.) Joint Electron Device Engineering Council Soild State Technology Association

Türk Standardları Enstitüsü

  • TS 279-1965 CREEP AND TIME FOR RUPTURE TENS?ON TESTS ON METALLIC MATERIALS

European Committee for Standardization (CEN)

  • EN ISO 3503:2015 Plastics piping systems - Mechanical joints between fittings and pressure pipes - Test method for leaktightness under internal pressure of assemblies subjected to bending (ISO 3503:2015)

American Petroleum Institute (API)

  • API TR 17TR11-2015 Pressure Effects on Subsea Hardware During Flowline Pressure Testing in Deep Water (FIRST EDITION)