project budget cost
project budget cost, Total:53 items.
The international standard classification for "project budget cost" includes: Road engineering in general , Power stations in general , Power transmission and distribution networks , Hydraulic construction .
The Chinese standard classification for "project budget cost" includes: Highway engineering , Electric power engineering in general , Power transmission and transformation engineering .
Professional Standard - Traffic
- JTG B06-2007 JTG B06-2007
- JTG 3830-2018 Method for Compiling Estimated Budget of Highway Engineering Construction Project
Henan Provincial Standard of the People's Republic of China
- DB41/T 2413-2023 High standard farmland construction project estimated budget preparation procedures
Professional Standard - Electricity
- DL/T 5541-2018 Guidelines for the division of project budget for the construction of the ground pole project of the converter station
- DL/T 5475-2013 Guidelines for Item Segregation of Construction Budget for Garbage Power Generation Project
- DL/T 5471-2013 Guidelines for item segregation of construction budget for substation,switch station and convertor station projects
- DL/T 5478-2013 Guidelines for Item Segregation of Construction Budget for 20kV and Under Electricity Distribution Network Projects
- DL/T 5472-2013 Guidelines for Item Segregation of Construction Budget for Overhead Transmission Line Projects
- DL/T 5540-2018 Guidelines for the division of budget items for the construction of natural gas distributed energy supply stations
- DL/T 5470-2013 Guidelines for Item Segregation of Construction Budget for Thermal Power Generation Project
- DL/T 5474-2013 Guidelines for Item Segregation of Construction Budget for Biomass Power Generation Project
- DL/T 5479-2022 Guidelines for the division of communication construction budget items
- DL/T 5479-2013 Guidelines for Item Segregation of Construction Budget for Communication Engineering
- DL/T 5476-2013 Guidelines for Item Segregation of Construction Budget for Cable Transmission Line Project
Professional Standard - Energy
- DL/T 5478-2021 Guidelines for item segregation of construction budget for 20kV and under electricity distribution network projects
- NB/T 20024-2010 Methodology for Cost Estimation of Nuclear Power Plant Construction Project
- DL/T 5472-2021 Guidelines for the division of budget items for overhead transmission line engineering construction
- DL/T 5476-2021 Guidelines for item segregation of construction budget for cable transmission line project
- DL/T 5471-2021 Guidelines for item segregation of construction budget for substation, switch station and convertor station projects
- DL/T 5470-2021 Guidelines for item segregation of construction budget for thermal power generation project
Hebei Provincial Standard of the People's Republic of China
- DB1301/T 496-2023 Fiscal Budget Item Library (County and District) Part 1: System Function Guide
- DB1301/T 497-2023 Fiscal Budget Item Database (County and District) Part 2: Metadata
Group Standards of the People's Republic of China
- T/GSA 2-2018 Specifications for calculating software development costs of informatization projects
- T/CTBA 004-2021 Sample Prequalification Document for Selection of Investors for Public-Private Partnership (PPP) Projects ( Highway Projects)
- T/CSEE 0161-2020 Guidelines for the division of budget items for distributed photovoltaic power generation projects
- T/CCS 055-2023 Full-process cost accounting guide for carbon capture-displacement oil recovery projects in coal-fired power plants
- T/SDASTC 004-2021 Guidelines for the whole process budget performance management of construction projects
Liaoning Provincial Standard of the People's Republic of China
- DB21/T 3722.3-2023 High Standard Farmland Construction Guide Part 3: Project Budget Quota
Professional Standard - Water Conservancy
- SL 557-2012 Rules for final accounts audit for completion of water capital construction project
CZ-CSN
- CSN 01 3905-1955 Numbered Documents Project and Budget Documents
GB-REG
- REG NASA-LLIS-1342-2003 Lessons Learned ?Project Management: Diminishing Budgets, Increasing Overhead and the Cost of Doing Business
Association Francaise de Normalisation
- FD X50-137:2006 Project management - Cost management
- CWA 16022:2009 Project Schedule and Cost Performance Management (PSCPM)
- NF EN 16601-60:2015 Management des projets spatiaux - Maîtrise des coûts et des délais
- NF L90-100-60*NF EN 16601-60:2015 Space project management - Cost and schedule management
- NF X50-774:2019 Training project management - Successful completion of a skills development project
American Railway Engineering and Maintenance-of-Way Association (AREMA)
- AREMA CH 32-3-1996 Cost Estimating and Budgeting Module
American Society for Testing and Materials (ASTM)
- ASTM E2620-08 Standard Classification for Program and Project Estimate Summaries
SSPC - The Society for Protective Coatings
- TU 9-2001 Estimating Costs for Protective Coatings Projects (Editorial Revisions November 1@ 2004)
SCC
- AWWA CSC92079 A Computerized Approach to Capital Program Management
- DANSK DS/CWA 16022:2009 Project Schedule and Cost Performance Management (PSCPM)
- NS-EN 16601-60:2014 Space project management — Cost and schedule management
- AWWA CONS51073 Cost Effectiveness of Water Conservation Programs: Water Recycling
- AWWA CONS51072 Cost Effectiveness of Budget Based Landscape Program
Danish Standards Foundation
- DS/CWA 16022:2010 Project Schedule and Cost Performance Management (PSCPM)
British Standards Institution (BSI)
- BS CWA 16022:2009 Project schedule and cost performance management (PSCPM)
IX-ICAO
- ICAO 9842-2004 PROGRAMME BUDGET OF THE ORGANIZATION 2005 - 2006 -2007 MONTREAL, SEPTEMBER ?OCTOBER 2004
ES-UNE
- UNE-EN 16601-60:2014 Space project management - Cost and schedule management
Lithuanian Standards Office
- LST EN 16601-60-2014 Space project management - Cost and schedule management
RU-GOST R
- GOST R 57104-2016 Integrated Logistic Support. Maintenance program. Basic requirements
IN-BIS
- IS 11590 Pt.1-1986 GUIDELINES FOR CALCULATING THE UNIT PRICE COST OF CONSTRUCTION EQUIPMENT FOR RIVER VALLEY PROJECTS PART 1 GENERAL
AREMA - American Railway Engineering and Maintenance-of-Way Association
- CHAPTER 32/PART 3-2001 Cost Estimating and Budgeting Module (Volume 4/Systems Management)
- CHAPTER 32/PART 3-1996 Cost Estimating and Budgeting Module (Volume 4/Systems Management)
project budget,Project Budget Management,budget item,cost budget,project budget,cost budget,Guidelines for the division of waste-to-energy project construction budget items,project cost,budget cost,What does the project budget include?,indirect cost items,Indirect costs in the project,Project Budget Indirect Costs,project overhead,project budget cost,surface project budget