Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

project budget cost

project budget cost, Total:53 items.

The international standard classification for "project budget cost" includes: Road engineering in general , Power stations in general , Power transmission and distribution networks , Hydraulic construction .

The Chinese standard classification for "project budget cost" includes: Highway engineering , Electric power engineering in general , Power transmission and transformation engineering .


Professional Standard - Traffic

Henan Provincial Standard of the People's Republic of China

  • DB41/T 2413-2023 High standard farmland construction project estimated budget preparation procedures

Professional Standard - Electricity

  • DL/T 5541-2018 Guidelines for the division of project budget for the construction of the ground pole project of the converter station
  • DL/T 5475-2013 Guidelines for Item Segregation of Construction Budget for Garbage Power Generation Project
  • DL/T 5471-2013 Guidelines for item segregation of construction budget for substation,switch station and convertor station projects
  • DL/T 5478-2013 Guidelines for Item Segregation of Construction Budget for 20kV and Under Electricity Distribution Network Projects
  • DL/T 5472-2013 Guidelines for Item Segregation of Construction Budget for Overhead Transmission Line Projects
  • DL/T 5540-2018 Guidelines for the division of budget items for the construction of natural gas distributed energy supply stations
  • DL/T 5470-2013 Guidelines for Item Segregation of Construction Budget for Thermal Power Generation Project
  • DL/T 5474-2013 Guidelines for Item Segregation of Construction Budget for Biomass Power Generation Project
  • DL/T 5479-2022 Guidelines for the division of communication construction budget items
  • DL/T 5479-2013 Guidelines for Item Segregation of Construction Budget for Communication Engineering
  • DL/T 5476-2013 Guidelines for Item Segregation of Construction Budget for Cable Transmission Line Project

Professional Standard - Energy

  • DL/T 5478-2021 Guidelines for item segregation of construction budget for 20kV and under electricity distribution network projects
  • NB/T 20024-2010 Methodology for Cost Estimation of Nuclear Power Plant Construction Project
  • DL/T 5472-2021 Guidelines for the division of budget items for overhead transmission line engineering construction
  • DL/T 5476-2021 Guidelines for item segregation of construction budget for cable transmission line project
  • DL/T 5471-2021 Guidelines for item segregation of construction budget for substation, switch station and convertor station projects
  • DL/T 5470-2021 Guidelines for item segregation of construction budget for thermal power generation project

Hebei Provincial Standard of the People's Republic of China

  • DB1301/T 496-2023 Fiscal Budget Item Library (County and District) Part 1: System Function Guide
  • DB1301/T 497-2023 Fiscal Budget Item Database (County and District) Part 2: Metadata

Group Standards of the People's Republic of China

  • T/GSA 2-2018 Specifications for calculating software development costs of informatization projects
  • T/CTBA 004-2021 Sample Prequalification Document for Selection of Investors for Public-Private Partnership (PPP) Projects ( Highway Projects)
  • T/CSEE 0161-2020 Guidelines for the division of budget items for distributed photovoltaic power generation projects
  • T/CCS 055-2023 Full-process cost accounting guide for carbon capture-displacement oil recovery projects in coal-fired power plants
  • T/SDASTC 004-2021 Guidelines for the whole process budget performance management of construction projects

Liaoning Provincial Standard of the People's Republic of China

  • DB21/T 3722.3-2023 High Standard Farmland Construction Guide Part 3: Project Budget Quota

Professional Standard - Water Conservancy

  • SL 557-2012 Rules for final accounts audit for completion of water capital construction project

CZ-CSN

GB-REG

  • REG NASA-LLIS-1342-2003 Lessons Learned ?Project Management: Diminishing Budgets, Increasing Overhead and the Cost of Doing Business

Association Francaise de Normalisation

American Railway Engineering and Maintenance-of-Way Association (AREMA)

American Society for Testing and Materials (ASTM)

  • ASTM E2620-08 Standard Classification for Program and Project Estimate Summaries

SSPC - The Society for Protective Coatings

  • TU 9-2001 Estimating Costs for Protective Coatings Projects (Editorial Revisions November 1@ 2004)

SCC

Danish Standards Foundation

British Standards Institution (BSI)

IX-ICAO

  • ICAO 9842-2004 PROGRAMME BUDGET OF THE ORGANIZATION 2005 - 2006 -2007 MONTREAL, SEPTEMBER ?OCTOBER 2004

ES-UNE

Lithuanian Standards Office

RU-GOST R

  • GOST R 57104-2016 Integrated Logistic Support. Maintenance program. Basic requirements

IN-BIS

  • IS 11590 Pt.1-1986 GUIDELINES FOR CALCULATING THE UNIT PRICE COST OF CONSTRUCTION EQUIPMENT FOR RIVER VALLEY PROJECTS PART 1 GENERAL

AREMA - American Railway Engineering and Maintenance-of-Way Association