Timely color year
Timely color year, Total:131 items.
The international standard classification for "Timely color year" includes: Geology. Meteorology. Hydrology .
The Chinese standard classification for "Timely color year" includes: Meteorology .
Professional Standard - Nuclear Industry
- EJ/T 546-1991 Isochronal age determination of rock minerals SmNd
- EJ/T 692-1992 Isochronal age determination of rock mineral rubidium strontium
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB/T 51266-2017 Standard of annual basic working hour for design of machinery factory
Professional Standard - Machinery
- JBJ/T 2-2000 STANDARD OF BASIC DATA OF YEARLY WORKHOUR FOR DESIGN OF MACHINERY FACTORY
Guangdong Provincial Standard of the People's Republic of China
- DB4403/T 465-2024 Temporary guardianship of minors
Zhejiang Provincial Standard of the People's Republic of China
- DB3305/T 222-2022 In the new era, youth theory preaches volunteer service norms
Professional Standard - Meteorology
- QX/T 286-2015 Data file format of annual maximum precipitation in 15 time intervals
Taiwan Provincial Standard of the People's Republic of China
- CNS 8662-1982 Graphic Symbols for Clocks and Electrical Time Service Devices
The American Road & Transportation Builders Association
- AASHTO DIVISION I 14.5 General Requirements for Bearings Interim 1997; Interim 1998; Interim 2000
- AASHTO DIVISION I 14.6 Special Design Provisions for Bearings Interim 1997; Interim 1998; Interim 2000
- AASHTO DIVISION I 5.8 Mechanically Stabilized Earth Wall Design Interim 1997; Interim 1998; Interim 1999
- AASHTO DIVISION I 7.5 Abutments Interim 1997; Interim 2000
- AASHTO DIVISION II 18.4 Materials Interim 1997; Interim 1998; Interim 2000(Standard Specifications for Highway Bridges, Div. 2 - Construction)
- AASHTO DIVISION II 30.5 Installation Interim 1998
- AASHTO DIVISION II 30.1 General Interim 1998
- AASHTO DIVISION II 30.3 Materials Interim 1998
- AASHTO DIVISION II 30.7 Payment Interim 1998
- AASHTO DIVISION I 10.18 Splices Interim 1998; Interim 1999; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION II 30.4 Assembly Interim 1998
- AASHTO DIVISION II 18.6 Corrosion Protection Interim 1997; Interim 1998
- AASHTO DIVISION II 30.6 Measurement Interim 1998
- AASHTO DIVISION I SEC 9-D Detailing Interim 1998; Interim 1999; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 10.61 Constructibility Interim 1997; Interim 2000
- AASHTO DIVISION II 9.10 Measurement Interim 1998
- AASHTO DIVISION II 18.12 Payment Interim 1997
- AASHTO DIVISION II 18.11 Measurement Interim 1997
- AASHTO DIVISION II 9.11 Payment Interim 1998
- AASHTO DIVISION II 9.9 Substitutions Interim 1998
- AASHTO DIVISION II 10.8 Ducts Interim 1998
- AASHTO DIVISION II 30.2 Working Drawings Interim 1998
- AASHTO DIVISION I SEC 10-A General Requirements and Materials Interim 1997; Interim 1999; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO CHBTW AMD 1-2008 Construction Handbook for Bridge Temporary Works (Revision 1; 2008 Interim Revision)
- AASHTO DIVISION II 18.2 Applicable Documents Interim 1997; Interim 1998; Interim 2000(Standard Specifications for Highway Bridges, Div. 2 - Construction)
- AASHTO DIVISION I 18.4 Plastic Pipe Interim 1997; Interim 1998; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION II 9.7 Splicing of Bars Interim 1998
- AASHTO DIVISION I 10.2 Materials Interim 1999; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 10.1 Application Interim 1999; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO GSBTW AMD 1-2008 Guide Design Specifications for Bridge Temporary Works (Revision 1; 2008 Interim Revision)
- AASHTO DIVISION I SEC 18 Soil-Thermoplastic Pipe Interaction Systems Interim 1997; Interim 1998; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION II 9.8 Splicing of Welded Wire Fabric or Mats Interim 1998; Interim 1999
- AASHTO DIVISION II 9.6 Placing and Fastening Interim 1998
- AASHTO DIVISION II 18.5 Fabrication Interim 1997; Interim 1998(Standard Specifications for Highway Bridges, Div. 2 - Construction)
- AASHTO DIVISION I 10.38 Composite Girders Interim 1997; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 14.7 Load Plates and Anchorage for Bearings Interim 1997; Interim 1998
- AASHTO DIVISION I 9.18 Ductility Limits Interim 1998; Interim 1999(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I SEC 10-B Design Details Interim 1998; Interim 1999; Interim 2000
- AASHTO DIVISION I-A 4.2 Selection of Analysis Method Interim 1999
- AASHTO DIVISION I 9.26 Cover and Spacing of Steel Interim 1998; Interim 1999(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION II 18.8 Packing, Shipping and Storing Interim 1997
- AASHTO DIVISION II 8.13 Precast Concrete Members Interim 1998
- AASHTO DIVISION I 12.6 Structural Plate Pipe Structures Interim 1997; Interim 1999(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 10.49 Unsymmetrical Beams and Girders Interim 1997; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 17.1 General Interim 1997; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 5.4 Notations Interim 1997; Interim 1999(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I 10.35 Trusses Interim 1997; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
- AASHTO DIVISION I SEC 10-D Strength Design Method Load Factor Design Interim 1997; Interim 2000(Standard Specifications for Highway Bridges, Div. 1 - Design)
SCC
- BS 6726:1991 Specification for festoon and temporary lighting cables and cords
- BS 6726:1998 Specification for festoon and temporary lighting cables and cords
- BS 6726:1986 Specification for festoon and temporary lighting cables and cords
- UL Subject 1088-2016 Temporary Lighting Strings (CSDS Proposal, 8/12/2016)
- SAE AMSQQA591B-2014 Aluminum Alloy Die Castings (Stabilized: Nov 2014)
- SAE AMS7171A-2011 Insulation Blanket, Thermal-Acoustical (Stabilized: Sep 2011)
- SAE AMSDTL22499B-2018 Shim Stock, Laminated (Stabilized: May 2018)
- SAE AMSQQA250/29A-2013 Aluminum Alloy 2124, Plate (Stabilized: Dec 2013)
- ULC Subject 1088-2015 STANDARD FOR TEMPORARY LIGHTING STRINGS (Bulletin, 7/13/2015)
- SAE AMSWWT700/3B-2018 Tube, Aluminum Alloy, Drawn, Seamless, 2024 (Stabilized: Feb 2018)
- SAE AMSHHG101A-2014 Gasket, Metallic-Encased (Stabilized: May 2014)
- SAE AMSR83285A-2011 Rubber, Ethylene-Propylene, General Purpose (Stabilized: Nov 2011)
- ULC 337-2004 Delayed-Action Timelocks (ULC S337)
- SAE MA1370A-2024 Screw Threads - MJ Profile, Metric (Stabilized: Apr 2024)
- ITU-T G.8273.4 AMD 2-2020 Timing characteristics of telecom boundary clocks and telecom time slave clocks for use with partial timing support from the network
- SAE AMSDTL22499/1B-2018 SHIM STOCK, LAMINATED, ALUMINUM ALLOY (Stabilized: Jan 2018)
- ITU-T Y.1368.4 AMD 2-2020 Timing characteristics of telecom boundary clocks and telecom time slave clocks for use with partial timing support from the network
- ITU-T G.8273.2 AMD 2-2020 Timing characteristics of telecom boundary clocks and telecom time slave clocks for use with full timing support from the network
- ITU-T Y.1368.2 AMD 2-2020 Timing characteristics of telecom boundary clocks and telecom time slave clocks for use with full timing support from the network
- SAE MA1508A-2024 Undercuts for Straight Screw Threads - Metric (Stabilized: Apr 2024)
- AENOR UNE 52003:1958 Determination of work times. Normal time and standard time.
- SAE AMSP46144A-2015 Plastic Sheet, Polycarbonate (Stabilized: Apr 2015)
- SAE AMSA22771D-2018 Aluminum Alloy Forgings, Heat Treated (Stabilized: Mar 2018)
- SAE AIR5665C-2024 Architecture Framework for Unmanned Systems (Stabilized: May 2024)
- SAE AMST5066B-2020 Tubing, Carbon Steel (1025) (Aircraft Quality) (Stabilized: Jul 2020)
- SAE AMSP21922A-2016 Plastic Rods and Tubes, Polyethylene (Stabilized: Oct 2016)
- SAE AMSA21180C-2017 Aluminum-Alloy Castings, High Strength (Stabilized: Jun 2017)
- SAE AMSQQA250/8C-2014 Aluminum Alloy 5052, Plate and Sheet (Stabilized: Jan 2014)
- SAE AMSQQA250/14B-2014 Aluminum Alloy 7178, Plate and Sheet (Stabilized: Feb 2014)
- SAE AMSQQA250/10C-2013 Aluminum Alloy 5454, Plate and Sheet (Stabilized: Dec 2013)
- SAE AMSQQA250/30A-2013 Aluminum Alloy 2219, Plate and Sheet (Stabilized: Dec 2013)
- UL Subject 917-2016 Standard for Clock-Operated Switches (CSDS Proposal, 4/15/2016)
- SAE AMSPRF46194B-2016 Foam, Rigid, Structural, Closed Cell (Stabilized: Sep 2016)
- SAE AMSQQA250/12A-2013 Aluminum Alloy 7075, Plate and Sheet (Stabilized: Dec 2013)
- BS BIP 0037:2005 Achieving BS 15000. Capacity management (to be published later in 2005)
ESDU - Engineering Sciences Data Unit
- ESDU 88038-2012 Estimation of hours per year when mean wind speed exceeds specified thresholds
- ESDU 88038-1988 Estimation of hours per year when mean wind speed exceeds specified thresholds.
AASHTO - American Association of State Highway and Transportation Officials
- LRFDLTS-2015 Interim Revisions to the LRFD Specifications for Structural Supports for Highway Signs@ Luminaires@ and Traffic Signals (First Edition; 2017 Interim Revision@ 2018 Interim Revision)
- GSBTW AMD 1-2008 Guide Design Specifications for Bridge Temporary Works (Revision 1; 2008 Interim Revision)
- PS-00 BOOK-2000 AASHTO Provisional Standards (2000 Edition; Interim Edition 4/2001)
- PS-00-2000 AASHTO Provisional Standards (2000 Edition; Interim Edition 4/2001)
- LRFDSEIS AMD 1-2010 2010 INTERIM REVISIONS TO THE AASHTO GUIDE SPECIFICATIONS FOR LRFD SEISMIC BRIDGE DESIGN (Edition 1; Interim Revision)
- MIB-4-1983 Manual for Maintenance Inspection of Bridges (Interim Specifications - 1989; Incorporated into MCEB)
- DIVISION I 10.12-1996 Flexural Members (Interim 1999; Interim 2000;)
Underwriters Laboratories (UL)
- UL 887 BULLETIN-2018 UL Standard for Safety Delayed Action Timelocks (COMMENTS DUE: May 28@ 2018)
- UL 887 BULLETIN-2017 UL Standard for Safety Delayed Action Timelocks (COMMENTS DUE: July 24@ 2017)
- UL 887 BULLETIN-2008 UL Standard for Safety Delayed-Action Timelocks (COMMENTS DUE: JULY 14@ 2008)
- UL 887 BULLETIN-2013 UL Standard for Safety Delayed Action Timelocks (COMMENTS DUE: March 04@ 2013)
- UL 887-1999 UL Standard for Safety Delayed-Action Timelocks
- UL 887-2018 UL Standard for Safety Delayed-Action Timelocks
International Telecommunication Union (ITU)
- ITU-T G.8273.2/Y.1368.2-2014 Timing characteristics of telecom boundary clocks and telecom time slave clocks
- ITU-T G.8273.2/Y.1368.2-2017 Timing characteristics of telecom boundary clocks and telecom time slave clocks
- ITU-T G.8273.2/Y.1368.2 AMD 1-2015 Timing characteristics of telecom boundary clocks and telecom time slave clocks; Amendment 1
- ITU-T G.8273/Y.1368-2013 Framework of phase and time clocks
- ITU-T G.8273.4/Y.1368.4 AMD 1-2021 Timing characteristics of telecom boundary clocks and telecom time slave clocks for use with partial timing support from the network; Amendment 1
CEPT - Conference Europeenne des Administrations des Postes et des Telecommunications
- CEPT T/CS 20-18-1981 Caracteristique Horloge Temps Reel
British Standards Institution (BSI)
- HB 10147-1999 The Millennium Time Bomb. A practical guide to the technical and legal issues.
Conference of European Post Telecommunication (CEPT)
- CEPT T/CS 20-18 E-1981 Real Time Clock; (ETSI ETR 202:1995)
American National Standards Institute (ANSI)
- ANSI/UL 887-2004 Delayed-Action Timelocks (Proposal dated 5/30/08)
US-CFR-file
- CFR 5-848.502-2014 Administrative personnel. Part848:Phased retirement. SubpartE:Computation of phased retirement annuity at phased retirement and composite retirement annuity at full retirement. section848.502:Computation of composite annuity at final retirement.
ES-AENOR
- UNE 52 003 Determination of working time, standard time and time types
ITU-T - International Telecommunication Union/ITU Telcommunication Sector
- ITU-T Y.1368.2-2017 Timing characteristics of telecom boundary clocks and telecom time slave clocks (Study Group 15)
- ITU-T G.8273.2-2014 Timing characteristics of telecom boundary clocks and telecom time slave clocks (Study Group 15)
- ITU-T Y.1368.2 AMD 1-2017 Timing characteristics of telecom boundary clocks and telecom time slave clocks Amendment 1 (Study Group 15)
- ITU-T G.8273.2 AMD 2-2019 Timing characteristics of telecom boundary clocks and telecom time slave clocks Amendment 2 (Study Group 15)
- ITU-T G.8273.2 AMD 1-2015 Timing characteristics of telecom boundary clocks and telecom time slave clocks Amendment 1 (Study Group 15)
National Aeronautics and Space Administration (NASA)
- NASA NPR 1441.1 REV D CHANGE 3-2006 NASA RECORDS RETENTION SCHEDULES (W/CHANGE 3, 1/31/06)
Institute of Interconnecting and Packaging Electronic Circuits (IPC)
- IPC TM-650 2.3.18-1986 Gel Time for Prepreg Materials; Revision A - April 1986
IETF - Internet Engineering Task Force
- RFC 2289-1998 A One-Time Password System (Part of STD 61;Obsoletes: 1938)
- RFC 1769-1995 Simple Network Time Protocol (SNTP) (Obsoletes RFC 1361; Obsoleted by RFC 2030)
- RFC 3339-2002 Date and Time on the Internet: Timestamps
RU-GOST R
- GOST R 53015-2008 Dressed coloured fur and sheepskins. Method of determining the color stability to friction
RO-ASRO
- STAS 11200/184-1980 Graphical symbols= GRAPHICAL SYMBOL FOR CLOCK, TIME SWITCH AND TIMER
IX-EU/EC
- COM(2001) 370 FINAL-2001 White Paper European Transport Policy for 2010: Time to Decide
Society of Motion Picture and Television Engineers (SMPTE)
- SMPTE EG 40-2002 Engineering Guideline Conversion of Time Values Between SMPTE 12M Time Code, MPEG-2 PCR Time Base and Absolute Time
Always color,What time color,t6 constant color,Color 83,100 million lottery,Directly hit real time color,Color method,t6,Time color device,Timely color year,Online time color