Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

centrosome formation time

centrosome formation time, Total:24 items.

The international standard classification for "centrosome formation time" includes: Relays .

The Chinese standard classification for "centrosome formation time" includes: Time and Frequency Measurement , Relay protection and automatic device .


National Metrological Verification Regulations of the People's Republic of China

Professional Standard - Machinery

US-FCR

International Telecommunication Union (ITU)

  • ITU-R TF.1876 FRENCH-2010 Trusted time source for Time Stamp Authority
  • ITU-R TF.1876 SPANISH-2010 Trusted time source for Time Stamp Authority
  • ITU-R TF.1876-2010 Trusted time source for Time Stamp Authority
  • ITU-R BT.808 SPANISH-1992 The broadcasting of time and date information in coded form
  • ITU-T R.81-1988 MAXIMUM ACCEPTABLE LIMIT FOR THE DURATION OF INTERRUPTION OF TELEGRAPH CHANNELS ARISING FROM FAILURE OF THE NORMAL POWER SUPPLIES
  • ITU-T R.81-1989 Maximum Acceptable Limit for the Duration of Interruption of Telegraph Channels Arising from Failure of the Normal Power Supplies - Telegraph Transmission (Study Group IX) 1 pp

SCC

  • AWWA WQTC69425 Temporal Behavior of Post-Filter GAC Adsorbers during THM Formation and Precursor Removal
  • AWWA ACE95084 Chlorate Formation in Sodium Hypochlorite Stock Solutions: Effects of Time and Temperature
  • AWWA WQTC52758 Effect of Bromide Spiking and Contact Time on Bromate Formation During Pre-Coagulation Ozonation
  • AWWA JAW68591 Journal AWWA — DBP Formation During Chlorination and Chloramination: Effect of Reaction Time, pH, Dosage, and Temperature
  • AWWA WQTC63953 Understanding the Relationship between Organic Precursor Fractions and Formation of NDMA and CNX in a Groundwater Supply

ITU-R - International Telecommunication Union/ITU Radiocommunication Sector

  • ITU-R TF.538-2-1992 Frequency and Time (Phase) Instability Measures Section 7D - Characterization of Sources and Time Scales Formation

British Standards Institution (BSI)

  • BS 3900-C1:1965 Methods of test for paints - Tests associated with paint film formation - Wet edge time
  • BS ISO 2541:2016 Centre drills for centre holes with radius form. Type R

GSO

Korean Agency for Technology and Standards (KATS)

ESDU - Engineering Sciences Data Unit

  • SPA-M9-2-2008 A study of deposit formation in a micro-bomb reactor (MBR): effect of residence time - Sept. 08 update.

RO-ASRO

FI-SFS

  • SFS 3375-1975 textile. Determination of formaldehyde gas residual time in dyes