Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Wind farm feasibility study

Wind farm feasibility study, Total:15 items.

The international standard classification for "Wind farm feasibility study" includes: Wind turbine systems and other alternative sources of energy .

The Chinese standard classification for "Wind farm feasibility study" includes: Wind energy .


国家能源局

  • NB/T 31104-2016 Preparation specification for pre-feasibility study report of onshore wind power projects
  • NB/T 10640-2021 Code for operation risk management of wind farm
  • NB/T 31105-2016 Preparation specification for feasibility study report of onshore wind power projects
  • NB/T 10588-2021 Code on operation and management for centralized control center of wind farm

Professional Standard - Energy

  • NB/T 31032-2012 Code for Preparation of Offshore Wind Power Projects Feasibility Study Report
  • NB/T 31031-2012 Code for Preparation of Offshore Wind Power Projects Pre-feasibility Study Report

Professional Standard - Electricity

Professional Standard - Technical Standards for Wind Farm Engineering

  • FD 001-2007 Preparation rules and calculation standard for budgetary estimation of windpower projects feasibility study report
  • FD 007-2011 Preparation rules of offshore windpower projects feasibility study report
  • FD 006-2008 Preparation rules of offshore windpower projects pre-feasibility study report

国家市场监督管理总局、中国国家标准化管理委员会

  • GB/T 38174-2019 Wind energy generation systems—Availability for wind power stations

Group Standards of the People's Republic of China

  • T/CEC 259-2019 Specifications for visual identification of wind farm safety

GSO

  • NB/T 31032-2019 Procedures for preparing feasibility study reports for offshore wind farm projects
  • NB/T 31031-2019 Procedures for the preparation of pre-feasibility study reports for offshore wind farm projects