NB/T 31031-2012 in English
SUPERSEDEDCode for Preparation of Offshore Wind Power Projects Pre-feasibility Study Report
- Issued on:2012-10-29
- Implemented on:2013-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$350.00
Scope
This standard specifies the principles, procedures, content, depth, and report preparation requirements for offshore wind farm project pre-feasibility study reports. This standard is applicable to the preparation of pre-feasibility study reports for newly built and expanded intertidal and subtidal tidal flats and offshore wind farm projects, and deep-sea wind farm projects can be implemented as a reference.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/SH/T 0909-2015 in English
Standard test method for peel strength of poultry defeathering wax
2015-10-27 -

NB/T 20389-2016 in English
Structural design code for the tunnels of water intake and outlet for nuclear power plants
2016-02-05 -

NB/T 42102-2016 in English
Guide to the interpretation of high voltage test techniques
2016-12-05 -

NB/T 31049-2021 in English
Insulation specification for wind turbine generator
2021-04-26 -

NB/T 35026-2022 in English
Code for Design of Concrete Gravity Dams
2022-11-04 -

NB/T 20374-2016 in English
Sampling airborne radioactive materials from the stacks of nuclear power plant
2016-02-05 -

NB/T 20050-2011 in English
Recommended Practice for the Protection of Electric Equipment in Nuclear Power Plants from Water Hazards
2011-07-01 -

NB/T 11121-2023 in English
Digital construction of underground coal mine - Evaluation index and method
2023-02-06 -

NB/T 10382-2019 in English
Technical specification for detection and inspection of coal preparation flotation compound reagent
2019-12-30 -

NB/T 11039-2022 in English
Technical specification for application of air-source heat pump in livestock farms
2022-11-04