Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

internal inspection cross inspection

internal inspection cross inspection, Total:64 items.

The international standard classification for "internal inspection cross inspection" includes: Explosives. Pyrotechnics , Grinding and polishing machines .

The Chinese standard classification for "internal inspection cross inspection" includes: Storage equipment and handling machinery , Chemical product , Clothing, footgear and headwear in general , Electric energy measurement and load control system , Grinding machine .


Group Standards of the People's Republic of China

  • T/GJSH 000003-2020 Inspection and Acceptance test for Crossbelt sorter
  • T/CASEI 040-2024 Fork-lift truck attachments—Welds inspection specification
  • T/LZZLXH 063-2021 Internal Calibration Specifications for Inspection and Testing Laboratories
  • T/CECS 698-2020 Indoor PM2.5 detection equipment performance inspection standard
  • T/CASEI 71001-2019 Explosion-proof fork-lift trucks—Periodical inspection specification
  • T/CASEI 002-2021 Specifications for periodic (first)inspection of forklift trucks
  • T/CAQI 176-2021 Guidelines for Internal Verification of Inspection and Testing Institutions Fulfilling Informed Commitments
  • T/SXCAA 025-2023 Guidelines for Internal Spot Check of Inspection and Testing Reports
  • T/STAX 014-2024 Specifications for periodic (initial) inspection of forklift trucks
  • T/GJSH 000009-2020 Inspection and Acceptance Test for Cross-belt Sorter(Chinese/English Bilingual Version)

Professional Standard - Commodity Inspection

  • SN/T 0317-1994 Rules for the inspection of fork lift trucks with internal combustion engine for export
  • SN/T 0306.3-2006 Rules for the inspection of export fireworks and firecracker - Part 3 : Batch test for display fireworks
  • SN/T 1309.6-2003 Rules for footwear inspection - Rules for the inspection of indoor footwear
  • SN/T 3701.10-2014 Technical requirements for the inspection of used electrical and mechanical products for import - Part 10:Fork lift trucks

Professional Standard - Railway

Taiwan Provincial Standard of the People's Republic of China

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 17215.811-2017 Electricity metering equipment (AC)—Acceptance inspection—Part 11: General acceptance inspection methods
  • GB/T 4682-2007 Internal cylindrical grinding machines with horizontal spindle—Testing of the accuracy
  • SN/T 4593-2016 Rule for the inspection of frozen channel catfish fillet for export
  • SN 1309.6-2003 Rules of footwear inspection -- Rules for inspection of indoor footwear

Anhui Provincial Standard of the People's Republic of China

  • DB34/T 1716-2022 Explosion-proof forklift regular (first) inspection procedures

Professional Standard - Agriculture

  • SN/T 0306.2-2018 Rules of the inspection of export fireworks - Part 2: Batch test

Henan Provincial Standard of the People's Republic of China

China National Accreditation Service for Conformity Assessment

  • CNAS GL 011-2018 Guidelines for Internal Audits of Laboratories and Inspection Bodies

Yunnan Provincial Standard of the People's Republic of China

Professional Standard - Hydroelectric Power

  • SD 111-1983 Verification method of AC instrument test equipment

South African Bureau of Standard

  • SANS 10388:2008 The inspection, examination and testing of lift trucks
  • SANS 5057:1993 Industrial trucks — Inspection and repair of fork arms in service on fork-lift trucks

Compressed Gas Association (U.S.)

Japanese Industrial Standards Committee (JISC)

  • JIS D 6001-1:2016 Fork lift trucks -- Safety requirements and verification -- Part 1: Fork lift trucks

Korean Agency for Technology and Standards (KATS)

  • KS B ISO 5057-2023 Industrial trucks — Inspection and repair of fork arms in service on fork-lift trucks
  • KS B ISO 12307-2-2002(2012) Plain bearings - Checking of wrapped bushes - Part 2: Checking the inside diameter
  • KS A ISO 2467:2010 Cinematography-Image area produced by 65 mm/5 perforation motion-picture camera aperture and maximum projectable image area on 70 mm/5 perforation motion-picture prints-Position and dimensions

German Institute for Standardization

  • DIN ISO 12307-2:2001 Plain bearings - Checking of wrapped bushes - Part 2: Checking the inside diameter (ISO 12307-2:2000)
  • DIN EN 283:1991 Swap bodies; testing; german version EN 283:1991

International Organization for Standardization (ISO)

  • ISO 2407:1997 Test conditions for internal cylindrical grinding machines with horizontal spindle - Testing of accuracy
  • ISO 12307-2:2000 Plain bearings - Checking of wrapped bushes - Part 2: Checking the inside diameter
  • ISO 2407:1973/Add 1:1974 Test conditions for internal cylindrical grinding machines with horizontal spindle — Testing of accuracy — Addendum 1
  • ISO 2407:1997/Amd 1:2016 Test conditions for internal cylindrical grinding machines with horizontal spindle — Testing of accuracy

British Standards Institution (BSI)

  • BS EN 62058-11:2010 Electricity metering equipment (a.c.). Acceptance inspection. Part 11: General acceptance inspection methods
  • BS ISO 5057:1998 Industrial trucks - Inspection and repair of fork arms in service on fork-lift trucks

Association Francaise de Normalisation

  • NF EN 62058-11:2010 Electricity (AC) metering equipment - Acceptance inspection - Part 11: general acceptance inspection methods
  • NF H96-407*NF ISO 5057:1996 Industrial trucks. Inspection and repair of fork arms in service on fork-lift trucks.
  • NF F52-513:1995 Railway fixed equipment. Built-up common crossing and cast crossing obtuse with fixed switch diamond. Cast steel cradles of built-up common crossing with movable switch diamond. Inspection.
  • NF B51-190-3:1998 Wood-based panels. Sampling, cutting and inspection. Part 3 : inspection of a consignment of panels.

Spanish Association for Standardization (UNE)

  • UNE-EN 62058-11:2011 Electricity metering equipment (a.c.) - Acceptance inspection -- Part 11: General acceptance inspection methods

Magyar Szabványügyi Testület

  • MSZ 7188-1961 Dimensions and inspection of intersection lines
  • MSZ 11029/7-1983 electronic product. Cross detection of electronic instrument testing process

Danish Standards Foundation

  • DS/EN 62058-11:2010 Electricity metering equipment (a.c.) - Acceptance inspection - Part 11: General acceptance inspection methods

Swedish Institute for Standards

  • SS-EN 62058-11:2010 Electricity metering equipment (a.c.) - Acceptance inspection - Part 11: General acceptance inspection methods

American Water Works Association (AWWA)

GCC Standardization Organization

  • GSO IEC 62058-11:2012 ELECTRICITY METERING EQUIPMENT (AC) – ACCEPTANCE INSPECTION – Part 11: General acceptance inspection methods
  • GSO 376:1994 Code of practice for the inspection and testing of steam and hot water boilers -- Part 6: Periodic internal inspection

Association of German Mechanical Engineers

International union of railways

Association for Electrical, Electronic & Information Technologies (VDE)

Associação Brasileira de Normas Técnicas

American National Standards Institute (ANSI)

  • ANSI/AAMI ST72-2019 Bacterial endotoxin - Test methodologies, routine monitoring and alternatives to batch testing