Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

milestone breakthrough

milestone breakthrough, Total:100 items.

The international standard classification for "milestone breakthrough" includes: .

The Chinese standard classification for "milestone breakthrough" includes: Industrial automation and control device in general .


国家市场监督管理总局、中国国家标准化管理委员会

  • GB/T 22135-2019 Commissioning of electrical,instrumentation and control systems in the process industry—Specific phases and milestones

WRC - Welding Research Council

American Welding Society (AWS)

Institute of Electrical and Electronics Engineers (IEEE)

US-CFR-file

  • CFR 47-25.164-2014 Telecommunication. Part25:Satellite communications. Section25.164:Milestones.

GB-REG

Association Francaise de Normalisation

  • NF EN 62337:2014 Commissioning of electrical, measurement and control systems in the process industry - Specific phases and milestones
  • NF C46-072*NF EN 62337:2014 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

Danish Standards Foundation

  • DS/EN 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
  • DS/EN 62337:2007 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

Spanish Association for Standardization (UNE)

  • UNE-EN 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (Endorsed by AENOR in June of 2012.)
  • UNE-EN 60335-2-45:2004/A11:2024 Household and similar electrical appliances - Safety - Part 2-45: Particular requirements for portable heating tools and similar appliances

GSO

  • OS GSO IEC 62337:2015 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
  • BH GSO IEC 62337:2016 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

European Committee for Electrotechnical Standardization(CENELEC)

  • EN 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones

SCC

  • DANSK DS/EN 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
  • CEI EN 62337:2013 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones
  • AWWA WQTC65939 The Drinking Water Laboratory Response Preparedness Project: Milestones and Lessons Learned
  • 05/30140361 DC IEC 62337. Milestones and activities during commissioning of electrical, instrumentation and control systems in the process industry
  • 10/30233312 DC BS EN 62337. Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones
  • AENOR UNE 135360 EX:1994 Vertical signage. Beacon. Vertex milestones in polymer material. Characteristics, measurements and test methods.
  • AENOR UNE 135360:2012 Vertical signage. Beacon. Vertex milestones in polymer material. Characteristics, dimensions and test methods.
  • DIN EN 62337 E:2011 Draft Document - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (IEC 65E/166/CDV:2010); German version FprEN 62337:2010
  • SPC GB/T 22135-2019 Commissioning of electrical,instrumentation and control systems in the process industry -- Specific phases and milestones (TEXT OF DOCUMENT IS IN CHINESE)
  • AENOR UNE-EN 62337:2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (Endorsed by AENOR in June of 2012.)

CENELEC - European Committee for Electrotechnical Standardization

  • EN 62337:2007 Commissioning of electrical@ instrumentation and control systems in the process industry - Specific phases and milestones

Korean Agency for Technology and Standards (KATS)

  • KS C IEC 62337-2019 Commissioning of electrical, instrumentation and control systems in the process industry — Specific phases and milestones
  • KS C IEC 62337-2014(2019) Commissioning of electrical, instrumentation and control systems in the process industry — Specific phases and milestones

British Standards Institution (BSI)

  • BS EN 62337:2012(2013) Commissioning of electrical, instrumentation and control systems in the process industry — Specific phases and milestones

CZ-CSN

  • CSN 64 0924-1977 Break-through volume capaci- ty of strong acid cation ex- changere in the Na+ -form
  • CSN 64 0922-1977 ?Brealc-through volume capa- city of strong acid+cation exchangers in the H -form

IN-BIS

  • IS 5720-1970 Retractor, mastoid, self-retaining (Morrison pattern) specifications

IEC - International Electrotechnical Commission

  • PAS 62337-2002 Milestones and Activities During Commissioning of Electrical Instrumentation and Control Systems in the Process Industry (Edition 1.0)

RU-GOST R

  • GOST R IEC 62337-2016 Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones

IEEE - The Institute of Electrical and Electronics Engineers@ Inc.

  • IEEE SA IC-2018 Industry Connections (IEEE‐IC) Landmarks and Measurement Standards Comparison in 3D Body‐model Processing

Lithuanian Standards Office

  • LST EN 62337-2012 Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones (IEC 62337:2012)

HU-MSZT

International Organization for Standardization (ISO)

  • ISO 8490:1986 Metallic materials; Sheet and strip; Modified Erichsen cupping test

RO-ASRO

  • STAS 3505-1978 Plants for warm used water treatment BOILER WITH PRESSURE BREAKING BASIN NP 2,5

International Electrotechnical Commission (IEC)

  • IEC PAS 62337:2002 Milestones and activities during commissioning of electrical instrumentation and control systems in the process industry

VDE - VDE Verlag GmbH@ Berlin@ Germany

  • VDE 0810-37-2013 Commissioning of electrical@ instrumentation and control systems in the process industry - Specific phases and milestones (IEC 62337:2012); German version EN 62337:2012@ with CD-ROM