summary plan
summary plan, Total:35 items.
The international standard classification for "summary plan" includes: Software development and system documentation .
The Chinese standard classification for "summary plan" includes: Mathematics .
Jiangsu Provincial Standard of the People's Republic of China
- DB3213/T 1062-2023 Guidelines for standardized management of water conservation for planned water users
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB/T 13400.3-1992 General progam of network planning techniques used in project management
Magyar Szabványügyi Testület
- MSZ 1228/2-1985 General requirements of project plan, engineering structure
- MSZ 1228/3.lap-1965 Building construction plan general layout work standard
- MSZ 14753/4.lap-1965 Building plan. Structural plan related calculations
- MSZ 14753/2.lap-1965 Building plan. Structural design. Welded steel structure calculations
- MSZ 1228/1-1984 General requirements building plan in architectural drawings
International Telecommunication Union (ITU)
- ITU-T R.122 SPANISH-1988 SUMMARY OF TRANSMISSION PLANS FOR RATES UP TO 300 BAUDS
- ITU-T R.122 FRENCH-1988 SUMMARY OF TRANSMISSION PLANS FOR RATES UP TO 300 BAUDS
US Federal Contractor Registration (USFCR)
- FCR COE EL-93-17 FINAL REPORT-1993 SUMMARY REPORT: BIOLOGICAL RESOURCES PROGRAM DEVELOPMENT TASK AREA
- FCR AF R AFMC 92-2-1992 HEADQUARTERS AFMC FACILITIES FIRE PLAN
North Atlantic Treaty Organization Standards Agency
- STANAG 4373-2007 THE NATO MASTER NAVIGATION PLAN
- STANAG 4373-1996 NATO Master Navigation Plan (ED 1)
British Standards Institution (BSI)
- BS EN 1575:1996(1999) EDI — Message — Bayplan / stowage plan total numbers message (BAPLTE)
- BS 5502-2-2.1:1981 Code of practice for design of buildings and structures for agriculture. Special considerations-General design and planning
- BS EN 1575:1996 EDI. Message. Bayplan/stowage plan total numbers message (BAPLTE)
- BS 6349-1-1:2013 Maritime works. General. Code of practice for planning and design for operations
Spanish Association for Standardization (UNE)
- UNE-EN 1575:1996 EDI. MESSAGE. PAYPLAN/STOWAGE PLAN TOTAL NUMBERS MESSAGE (BAPLTE).
American Water Works Association (AWWA)
- AWWA 65068V Emergency Planning: The Big Picture for Water Utilities
- AWWA ACE65143 Groundwater Action Plan — Master Planning Municipal Wellfields
National Standardisation Body (ASRO)
- STAS 11208-1979 Works for ports GENERAL PLAN Design rules
German Institute for Standardization
- DIN 21902-2:2008-08 Mine plans - Structure of mining specific plans - Part 2: Completion of mine plans
- DIN 21902-2 E:2006 Draft Document - Mine plans - Structure of mining specific plans - Part 2: Completion of mine plans
- DIN 32934:2006-06 Gymnastic and sport equipment - General plan
- DIN 21902-2 E:2006-10 Draft Document - Mine plans - Structure of mining specific plans - Part 2: Completion of mine plans
- DIN V 32950:1997-04 Geometrical product specification (GPS) - Masterplan (ISO/TR 14638:1995)
United States Navy
- NAVY DI-SESS-81521 B-2001 TRAINING PROGRAM STRUCTURE DOCUMENT
- NAVY DI-SESS-81521 B VALID NOTICE 1-2006 TRAINING PROGRAM STRUCTURE DOCUMENT
International Organization for Standardization (ISO)
- ISO/TR 24098:2007 Intelligent transport systems - System architecture, taxonomy and terminology - Procedures for developing ITS deployment plans utilizing ITS system architecture
Canadian Standards Association (CSA)
- CAN/CSA-N286.0-1992(R2003) Overall Quality Assurance Program Requirements for Nuclear Power Plants
- CAN/CSA N286.0-1992(R1998) Overall Quality Assurance Program Requirements for Nuclear Power Plants
COMMISSION FOR THE STANDARDS, METROLOGY AND QUALITY OF VIETNAM (STAMEQ)
- TCVN 4616-1988 Planning of general plan of industrial groups.Design standard
Association of German Mechanical Engineers
- DVS 1710-2010 Welding plans in metal structures
Military Standards (MIL-STD)
- MIL MIL-STD-1530D-2016 Aircraft Structural Integrity Program (ASIP)
Society of Automotive Engineers (SAE)
- SAE AS4117A-2017 Test Plan for The Digital Time Division Command/Response Multiplex Data Bus Couplers@ Terminators@ and Data Bus Cables
Summarize,Method summary,test summary,work summary,summary report,data summary,Summary ability,Year-end summary and plans for the coming year,Experience summary,End of month summary,summary plan,Experiment summary,project summary,Year-end summary,Recent summary,Experiment summary,Evaluation Summary,Summary of the 12th Five-Year Plan