Exclusive procurement of equipment
Exclusive procurement of equipment, Total:238 items.
The international standard classification for "Exclusive procurement of equipment" includes: Installations in buildings .
The Chinese standard classification for "Exclusive procurement of equipment" includes: Heat supply, air supply, air conditioning and refrigerating engineering in general , Gas turbine and its auxiliary equipment .
Group Standards of the People's Republic of China
- T/GJSH 000005-2020 Automatic Sorting Equipment Purchase Contract Template——Chinese and English Version
- T/GJSH 000001-2020 Automatic sorting equipment purchase contract template
- T/UNP 55-2023 International procurement —Technical requirements for small household appliance —Household hydrogen oxygen machines
- T/NKFA 009-2022 Furniture supply chain management—Procurement specification
- T/ZFA 2-2021 Government procurement- Guidelines for procurement demand management of furniture project
- T/ZJGPA 1-2021 Government procurement- Guidelines for procurement demand management of furniture project
- T/UNP 58-2023 International procurement—Technical requirements for small household appliances products—Household floor scrubber
Professional Standard - Chemical Industry
- HG/T 20697-2007 Purchase specification on heating Ventilating and air conditioning equipment for chemical plant
Professional Standard - Machinery
- JB/T 8953.1-1999 Basic procurement information for combined-cycle plants
- JB/T 8953.3-1999 Procurement for combined-cycle plants HRSG
- JB/T 8953.2-1999 Steam turbine procurement for combined-cycle plants
未注明发布机构
- SEMI E149-0707-2007 GUIDE FOR EQUIPMENT SUPPLIER-PROVIDED DOCUMENTATION FOR THE ACQUISITION AND USE OF MANUFACTURING EQUIPMENT
国家质量监督检验检疫总局
- SN/T 4680-2016 Preparation requirements of technical requirements for laboratory instrument and equipment procurement
Liaoning Provincial Standard of the People's Republic of China
- DB2101/T 0079-2023 Credit Management Standards for Government Procurement Review Experts
Sichuan Provincial Standard of the People's Republic of China
- DB51/T 1252-2011 Quality acceptance specification for government procurement of teaching instruments and equipment
Military Standard of the People's Republic of China-General Armament Department
- GJB 8298-2015 Product evaluation requirements for centralized procurement of computers and network equipment
NZ-SNZ
- MP 6652-1978 THE PROCUREMENT OF ELECTRONIC EQUIPMENT
CN-STDBOOK
- 图书 A-4936 Government Procurement Separately Entrusted Project Electronic Procurement Document Template
SCC
- AWWA ACE54268 A Unique Approach for Membrane Equipment Procurement: The Minneapolis Water Works Experience
- AWWA ACE54451 Obtaining Equitable Procurement of Membrane Filtration Equipment
- NS 8438:2023 General terms of contract concerning the purchase of medical equipment and laboratory equipment
- CEI UNI EN 45510-2-5:2006 Guide for procurement of power station equipment - Part 2-5: Electrical equipment - Motors
- CEI UNI EN 45510-2-7:2006 Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear
- NS-EN 45510-2-7:2002 Guide for procurement of power station equipment — Part 2-7: Electrical equipment — Switchgear and controlgear
- DANSK DS/EN 45510-2-7:2002 Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear
- DIN EN 45520 E:1995 Draft Document - Guide for procurement - Electrical equipment - Transformers; German version prEN 45520:1994
- NS-EN 45510-4-8:1999 Guide for procurement of power station equipment — Part 4-8: Boiler auxiliaries — Dust handling plant
- CEI UNI EN 45510-4-4:2006 Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipment
- NS-EN 45510-2-9:2008 Guide for procurement of power station equipment — Part 2-9: Electrical equipment — Cabling systems
- NS-EN 45510-2-5:2002 Guide for procurement of power station equipment — Part 2-5: Electrical equipment — Motors
- DANSK DS/EN 45510-2-9:2008 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- NS-EN 45510-4-4:2002 Guide for procurement of power station equipment — Part 4-4: Boiler auxiliaries — Fuel preparation equipment
- DANSK DS/EN 45510-4-8:2000 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant
- CEI UNI EN 45510-2-8:2006 Guide for procurement of power station equipment - Part 2-8: Electrical equipment - Power cables
- CEI UNI EN 45510-2-6:2000 Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators
- DANSK DS/EN 45510-2-6:2000 Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators
- DANSK DS/EN 45510-2-5:2002 Guide for procurement of power station equipment - Part 2-5: Electrical equipment - Motors
- NS-EN 45510-2-8:2004 Guide for procurement of power station equipment — Part 2-8: Electrical equipment — Power cables
- DANSK DS/EN 45510-2-8:2004 Guide for procurement of power station equipment - Electrical equipment - Part 2-8: Power cables
- DANSK DS/EN 45510-4-4:2002 Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipment
- NS-EN 45510-2-6:2000 Guide for procurement of power station equipment — Part 2-6: Electrical equipment — Generators
- CEI UNI EN 45510-4-8:2000 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant
- CEI UNI EN 45510-5-1:2000 Guide for procurement of power station equipment - Part 5-1: Steam turbines
- DANSK DS/EN 45510-1:1998 Guide for procurement of power station equipment - Part 1: Common clauses
- CEI UNI EN 45510-2-2:1999 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- DANSK DS/EN 45510-2-2:1999 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- NS-EN 45510-4-3:1999 Guide for procurement of power station equipment — Part 4: Boiler auxiliaries — Section 3: Draught plant
- DANSK DS/EN 45510-6-4:2000 Guide for procurement of power station equipment - Part 6-4: Turbines auxiliaries - Pumps
- DANSK DS/EN 45510-4-3:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 3: Draught plant
- DANSK DS/EN 45510-5-2:1998 Guides for procurement of power station equipment - Part 5-2: Gas turbines
- NS-EN 45510-1:1997 Guide for procurement of power station equipment — Part 1: Common clauses
- NS-EN 45510-5-2:1998 Guide for procurement of power station equipment — Part 5-2: Gas turbines
- CEI UNI EN 45510-1:1999 Guide for procurement of power station equipment - Part 1: Common clauses
- CEI UNI EN 45510-4-9:2000 Guide for procurement of power station equipment - Part 4-9: Boiler auxiliaries - Sootblowers
- NS-EN 45510-2-2:1999 Guide for procurement of power station equipment — Part 2-2: Electrical equipment — Uninterruptible power supplies
- CEI UNI EN 45510-4-3:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 3: Draught plant
- CEI UNI EN 45510-6-8:2000 Guide for procurement of power station equipment - Part 6-8: Turbine auxiliaries - Cranes
- CEI UNI EN 45510-5-2:2000 Guide for procurement of power station equipment - Part 5-2: Gas turbines
- AWWA MTC69793 Being a Smart Buyer: Low Pressure Membrane System Procurement
- AWWA IMTECH57880 Procuring Major Information Systems — How to Pick a Winner
- NS-EN 45510-8-1:1998 Guide for procurement of power station equipment — Part 8-1: Control and instrumentation
- AENOR UNE-EN 45510-8-1:1999 Guide for purchase of equipment for power plants. Part 8-1: Control and instrumentation.
- NS 11042:2024 Universal design and digitalization - Procurements
- CEI UNI EN 45510-8-1:2000 Guide for procurement of power station equipment - Part 8-1: Control and instrumentation
- DANSK DS/EN 45510-5-1:1998 Guides for procurement of power station equipment - Part 5-1: Steam turbines
RU-GOST R
- GOST R 56327-2014 Medical electrical equipment. Ultrasonic equipment of expert class. Technical requirements for governmental purchases
- GOST R 53143-2008 Retted straw. Requirements for state purchases
- GOST R 57086-2016 Medical electrical equipment. Devices for laser lithotripsy. Technical requirements for governmental purchases
- GOST R 55952-2014 Medical electrical equipment. Electrocardiographic monitoring equipment. Technical requirements for public procurement
- GOST R 56279-2014 Medical electrical equipment. Endoscopic racks. Specifications for governmental purchase
- GOST R 56331-2014 Medical electrical equipment. Medical diagnostic ultrasonic equipment. Technical requirements for governmental purchases
- GOST R 56326-2017 Medical equipment. Multifunction patient monitoring equipment. Technical requirements for governmental purchases
- GOST R 56128-2014 Medical electrical equipment. Operating luminaires. Technical requirements for governmental purchases
- GOST R 57185-2016 Medical electrical equipment. Infusion pumps. Technical requirements for governmental purchases
- GOST R 56107-2014 Medical electrical equipment. Operating tables. Technical requirements for governmental purchases
- GOST R 57184-2016 Medical electrical equipment. Devices and apparatus for cryoablation. Technical requirements for governmental purchases
- GOST R 56168-2014 Medical electrical equipment. Operation microscope. Specifications for governmental purchase
- GOST R 57089-2016 Medical electrical equipment. Dental intra-oral X-ray equipment. Technical requirements for governmental purchases
- GOST R 55719-2013 Medical electrical equipment. Demands to the contents and veneering of technical projects for the competitive documentation at carrying out of the state purchases of the highly technological medical equipment
- GOST R 55718-2013 Medical electrical equipment. Angiography X-ray equipment. Technical requirements for governmental purchases
- GOST R 56326-2014 Medical electrical equipment. Multifunction patient monitoring equipment. Technical requirements for governmental purchases
- GOST R 55771-2013 Medical electrical equipment. Angiography X-ray equipment. Technical requirements for governmental purchases
- GOST R 56314-2014 Medical electrical equipment. Dosimetry equipment for radiotherapy. Technical requirements for governmental purchases
- GOST R 56322-2014 Medical electrical equipment. Mammographic stereotactic devices. Technical requirements for governmental purchases
British Standards Institution (BSI)
- BS 8572:2011 Procurement of facility-related services. Guide
- BS EN 45510-2-5:2002 Guide for the procurement of power station equipment - Electrical equipment - Motors
- BS EN 45510-2-7:2002 Guide for the procurement of power station equipment - Electrical equipment - Switchgear and controlgear
- BS EN 45510-2-6:2000 Guide for the procurement of power station equipment - Electrical equipment - Generators
- BS EN 45510-8-1:1998 Guide for the procurement of power station equipment - Control and instrumentation
- BS EN 45510-2-8:2004 Guide for procurement of power station equipment - Electrical equipment - Power cables
- BS EN 45510-4-3:1999 Guide for the procurement of power station equipment - Boiler auxiliaries - Draught plant - Draught plant
- BS EN 45510-6-4:2000 Guide for the procurement of power station equipment - Turbine auxiliaries - Pumps - Pumps
- BS EN 45510-5-2:1998 Guide for the procurement of power station equipment - Gas turbines
- BS EN 45510-6-3:1998 Guide for the procurement of power station equipment - Turbine auxiliaries - Condenser plant
- BS EN 45510-1:1998 Guide for the procurement of power station equipment - Common clauses
- BS EN 45510-4-7:1999 Guide for the procurement of power station equipment - Boiler auxiliaries - Ash handling plant - Ash handling plant
- BS EN 45510-2-9:2008 Guide for procurement of power station equipment-Part 2-9: Electrical equipment - Cabling systems
- BS EN 45510-5-3:1998 Guide for the procurement of power station equipment - Wind turbines
- BS EN 45510-5-1:1998 Guide for the procurement of power station equipment - Steam turbines
- BS EN 45510-6-2:1998 Guide for the procurement of power station equipment - Turbine auxiliaries - Feedwater heaters
- BS EN 45510-6-1:1998 Guide for the procurement of power station equipment - Turbine auxiliaries - Deaerators
- BS EN 45510-6-7:1998 Guide for the procurement of power station equipment - Turbine auxiliaries - Moisture separator reheaters
- BS ISO 3977-3:2008 Gas turbines - Procurement - Design requirements
CN-QIYE
- Q/GDYY 040-2011 Management Measures for Tendering and Purchasing of Baking Room Equipment
U.S. Military Regulations and Norms
- ARMY MIL-I-45607 C-1987 INSPECTION EQUIPMENT, ACQUISITION, MAINTENANCE AND DISPOSITION OF
- ARMY MIL-I-45607 C VALID NOTICE 4-2002 INSPECTION EQUIPMENT, ACQUISITION, MAINTENANCE AND DISPOSITION OF
- ARMY MIL-I-45607 C NOTICE 3-1998 INSPECTION EQUIPMENT, ACQUISITION, MAINTENANCE AND DISPOSITION OF
- ARMY MIL-I-45607 C REINST NOTICE 2-1996 INSPECTION EQUIPMENT, ACQUISITION, MAINTENANCE AND DISPOSITION OF
German Institute for Standardization
- DIN EN 45510-2-6:2001-02 Guide for procurement of power station equipment - Part 2-6: Electrical equipment; Generators; German version EN 45510-2-6:2000
- DIN EN 45510-2-5:2003-11 Guide for procurement of power station equipment - Part 2-5: Electrical equipment; Motors; German version EN 45510-2-5:2002
- DIN EN 45510-2-4:2001-04 Guide for procurement of power station equipment - Part 2-4: Electrical equipment; high power static converters; German version EN 45510-2-4:2000
- DIN EN 45510-2-7:2003-12 Guide for procurement of power station equipment - Part 2-7: Electrical equipment; Switchgear and controlgear; German version EN 45510-2-7:2002
- DIN EN 45510-2-3:2001-04 Guide for procurement of power station equipment - Part 2-3: Electrical equipment; stationary batteries chargers; German version EN 45510-2-3:2000
- DIN EN 45510-2-9:2009-04 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems; German version EN 45510-2-9:2008
- DIN EN 45510-2-2:1999 Guide for procurement of power station equipment - Part 2-2: Electrical equipment; uninterruptible power supplies; German version EN 45510-2-2:1999
- DIN EN 45510-2-6:2001 Guide for procurement of power station equipment - Part 2-6: Electrical equipment; Generators; German version EN 45510-2-6:2000
- DIN EN 45510-4-8:1999-12 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant; German version EN 45510-4-8:1999
- DIN EN 45510-2-8:2005-03 Guide for procurement of power station equipment - Part 2-8: Electrical equipment - Power cables; German version EN 45510-2-8:2004
- DIN EN 45510-1:1997-12 Guide for procurement of power station equipment - Part 1: Common clauses; German version EN 45510-1:1997
- DIN EN 45510-5-1:1998-06 Guide for procurement of power station equipment - Part 5-1: Steam turbines; German version EN 45510-5-1:1998
- DIN EN 45510-2-9:2009 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems; German version EN 45510-2-9:2008
- DIN EN 45510-2-2:1999-12 Guide for procurement of power station equipment - Part 2-2: Electrical equipment; uninterruptible power supplies; German version EN 45510-2-2:1999
- DIN EN 45510-4-5:2002-11 Guide for procurement of power station equipment - Part 4-5: Boiler auxiliaries; Coal handling and bulk storage plant; German version EN 45510-4-5:2002
- DIN EN 45510-4-4:2002-11 Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries; Fuel preparation equipment; German version EN 45510-4-4:2002
- DIN EN 45510-5-2:1998-06 Guide for procurement of power station equipment - Part 5-2: Gas turbines; German version EN 45510-5-2:1998
- DIN EN 45510-1:1997 Guide for procurement of power station equipment - Part 1: Common clauses; German version EN 45510-1:1997
- DIN EN 45510-4-8:1999 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant; German version EN 45510-4-8:1999
- DIN EN 45510-6-1:1998-06 Guide for procurement of power station equipment - Part 6-1: Turbine auxiliaries; deaerators; German version EN 45510-6-1:1998
- DIN EN 45510-6-2:1998-06 Guide for procurement of power station equipment - Part 6-2: Turbine auxiliaries; feedwater heaters; German version EN 45510-6-2:1998
- DIN EN 45510-6-9:2000-02 Guide for procurement of power station equipment - Part 6-9: Turbine auxiliaries; cooling water systems; German version EN 45510-6-9:1999
- DIN EN 45510-6-4:2000-02 Guide for procurement of power station equipment - Part 6-4: Turbine auxiliaries; pumps; German version EN 45510-6-4:1999
- DIN EN 45510-8-1:1998-09 Guide for procurement of power station equipment - Part 8-1: Control and instrumentation; German version EN 45510-8-1:1998
IN-BIS
- IS 10219-1982 Nested Tube Evaporation Equipment Buyer Data Sheet
- IS 12356-1988 Clean Air Equipment Buyer Data Sheet (Laminar Flow)
GSO
- GSO EN 45510-2-5:2021 Guide for procurement of power station equipment - Part 2-5: Electrical equipment - Motors
- GSO EN 45510-2-6:2021 Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators
- BH GSO EN 45510-2-7:2022 Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear
- GSO EN 45510-2-7:2021 Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear
- BH GSO EN 45510-2-8:2022 Guide for procurement of power station equipment - Part 2-8: Electrical equipment - Power cables
- GSO EN 45510-2-9:2021 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- GSO EN 45510-2-8:2021 Guide for procurement of power station equipment - Part 2-8: Electrical equipment - Power cables
- BH GSO EN 45510-2-9:2022 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- GSO EN 45510-1:2021 Guide for procurement of power station equipment - Part 1: Common clauses
- GSO EN 45510-5-1:2021 Guide for procurement of power station equipment - Part 5-1: Steam turbines
- BH GSO EN 45510-5-1:2022 Guide for procurement of power station equipment - Part 5-1: Steam turbines
- GSO EN 45510-2-2:2021 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- BH GSO EN 45510-2-2:2022 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- BH GSO EN 45510-5-2:2022 Guide for procurement of power station equipment - Part 5-2: Gas turbines
- GSO EN 45510-5-2:2021 Guide for procurement of power station equipment - Part 5-2: Gas turbines
Association Francaise de Normalisation
- NF X50-001-2-5*NF EN 45510-2-5:2002 Guide for procurement of power station equipment - Part 2-5 : electrical equipment - Motors
- NF X50-001-2-7*NF EN 45510-2-7:2002 Guide for procurement of power station equipment - Part 2-7 : electrical equipment - Switchgear and controlgear
- NF EN 45510-2-5:2002 Guide for the acquisition of equipment intended for electricity production plants - Part 2-5: electrical equipment - Motors
- NF EN 45510-2-7:2002 Guide for the acquisition of equipment intended for electricity production plants - Part 2-7: electrical equipment - Apparatus
- NF X50-001-4-4*NF EN 45510-4-4:2002 Guide for procurement of power station equipement - Part 4-4 : boiler auxiliaries - Fuel preparation equipment
- NF EN 45510-2-9:2008 Guide for the acquisition of equipment for electricity production plants - Part 2-9: electrical equipment - Cabling systems
- NF X50-001-2-8*NF EN 45510-2-8:2005 Guide for procurement of power station equipment - Part 2-8 : electrical equipment - Power cables
- NF EN 45510-2-8:2005 Guide for the acquisition of equipment intended for electricity production plants - Part 2-8: electrical equipment - Power cables
- NF X50-001-4-3*NF EN 45510-4-3:1999 Guide for procurement of power station equipment. Part 4 : boiler auxiliaries. Section 3 : draught plant.
- NF X50-001-2-9*NF EN 45510-2-9:2008 Guide for procurement of power station equipment - Part 2-9 : electrical equipment - Cabling systems
- NF X50-001-1*NF EN 45510-1:1998 Guide for procurement of power station equipment. Part 1 : common clauses.
- NF X50-001-6-4*NF EN 45510-6-4:2000 Guide for the procurement of power station equipement - Part 6 : turbine auxiliaries - Section 4 : pumps
- NF X50-001-2-6*NF EN 45510-2-6:2000 Guide for procurement of power station equipment - Part 2 : electrical equipment - Section 6 : generators.
- NF EN 45510-4-4:2002 Guide for the acquisition of equipment for electricity production plants - Part 4-4: boiler auxiliaries - Fuel preparation systems
- NF X50-001-4-7*NF EN 45510-4-7:1999 Guide for procurement for power station equipement. Part 4 : boiler auxiliaries. Section 7 : ash handling plant.
- NF EN 45510-6-4:2000 Guide for the acquisition of equipment for electricity production plants - Part 6: turbine auxiliaries - Section 4: pumps
- NF EN 45510-6-1:1998 Guide for the acquisition of equipment for electricity production plants - Part 6-1: turbine auxiliaries. Degassers
- NF X50-001-2-2*NF EN 45510-2-2:1999 Guide for procurement of power station equipment - Part 2 : electrical equipment - Section 2 : Uninterruptible power supplies
GOSTR
- GOST 17109-1988 Soy-beans. Requirements for state purchases and deliveries
- GOST 8758-1976 Gram chir-pea. Requirements for state purchases and deliveries
- GOST 18315-1978 Anise. Industrial raw materials. Requirements for state purchass. Specifications
Danish Standards Foundation
- DS/EN 45510-2-6:2000 Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators
- DS/EN 45510-2-5:2002 Guide for procurement of power station equipment - Part 2-5: Electrical equipment - Motors
- DS/INF 174:2013 Recommendations for the public procurement of medical equipment, including assistive devices, in vitro diagnostic devices and implants - Procurement process, requirements specification, assessment criteria and contract conditions
- DS/EN 45510-2-7:2002 Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear
- DS/EN 45510-2-8:2004 Guide for procurement of power station equipment - Electrical equipment - Part 2-8: Power cables
- DS/EN 45510-4-8:2000 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant
- DS/EN 45510-4-4:2002 Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipment
- DS/EN 45510-2-9:2008 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- DS/EN 45510-6-4:2000 Guide for procurement of power station equipment - Part 6-4: Turbines auxiliaries - Pumps
- DS/EN 45510-1:1998 Guide for procurement of power station equipment - Part 1: Common clauses
- DS/EN 45510-5-1:1998 Guides for procurement of power station equipment - Part 5-1: Steam turbines
- DS/EN 45510-2-2:1999 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- DS/EN 45510-5-2:1998 Guides for procurement of power station equipment - Part 5-2: Gas turbines
- DS/EN 45510-4-7:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 7: Ash handling plant
- DS/EN 45510-4-3:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 3: Draught plant
- DS/EN 45510-6-8:2000 Guide for procurement of power station equipment - Part 6-8: Turbines auxiliaries - Cranes
- DS/EN 45510-5-3:1998 Guides for procurement of power station equipment - Part 5-3: Wind turbines
- DS/EN 45510-8-1:1998 Guide for procurement of power station equipment - Part 8-1: Control and instrumentation
Lithuanian Standards Office
- LST EN 45510-2-5-2003 Guide for procurement of power station equipment -- Part 2-5: Electrical equipment - Motors
- LST EN 45510-2-6-2001 Guide for procurement of power station equipment -- Part 2-6: Electrical equipment - Generators
- LST EN 45510-2-7-2003 Guide for procurement of power station equipment -- Part 2-7: Electrical equipment - Switchgear and controlgear
- LST EN 45510-4-3-2001 Guide for procurement of power station equipment -- Part 4-3: Boiler auxiliaries - Draught plant
- LST EN 45510-4-8-2001 Guide for procurement of power station equipment -- Part 4-8: Boiler auxiliaries - Dust handling plant
- LST EN 45510-5-1-2001 Guides for procurement of power station equipment -- Part 5-1: Steam turbines
- LST EN 45510-2-9-2008 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- LST EN 45510-2-8-2004 Guide for procurement of power station equipment -- Part 2-8: Electrical equipment - Power cables
- LST EN 45510-4-4-2003 Guide for procurement of power station equipment -- Part 4-4: Boiler auxiliaries - Fuel preparation equipment
- LST EN 45510-1-2001 Guide for procurement of power station equipment -- Part 1: Common clauses
- LST EN 45510-2-2-2001 Guide for procurement of power station equipment -- Part 2-2: Electrical equipment - Uninterruptible power supplies
- LST EN 45510-5-2-2001 Guides for procurement of power station equipment -- Part 5-2: Gas turbines
- LST EN 45510-4-1-2001 Guide for procurement of power station equipment -- Part 4-1: Boiler auxiliaries - Equipment for reduction of dust emissions
- LST EN 45510-8-1-2001 Guide for procurement of power station equipment -- Part 8-1: Control and instrumentation
GB-REG
- REG NASA-LLIS-4022-2011 Lessons Learned Spare Parts Procurement
AENOR
- UNE-EN 45510-2-7:2004 Guide for procurement of power station equipment -- Part 2-7: Electrical equipment - Switchgear and controlgear
- UNE-EN 45510-2-6:2001 Guide for procurement of power station equipment -- Part 2-6: Electrical equipment - Generators.
- UNE-EN 45510-2-5:2004 Guide for procurement of power station equipment -- Part 2-5: Electrical equipment - Motors
- UNE-EN 45510-2-8:2005 Guide for procurement of power station equipment -- Part 2-8: Electrical equipment - Power cables
- UNE-EN 45510-5-1:1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 5-1: STEAM TURBINES.
- UNE-EN 45510-4-8:2000 Guide for procurement of power station equipment -- Part 4-8: Boiler auxiliaries - Dust handling plant.
- UNE-EN 45510-4-4:2004 Guide for procurement of power station equipment -- Part 4-4: Boiler auxiliaries - Fuel preparation equipment
- UNE-EN 45510-1:1998 AUIDE POR PROCUREMENT OF POWER STATION EQUIPMENT. PART 1: COMMON CLAUSES.
- UNE-EN 45510-2-2:2000 Guide for procurement of power station equipment - Part 2-2: Electrical equipment - Uninterruptible power supplies
- UNE-EN 45510-5-2:1999 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 5-2: GAS TURBINES.
- UNE-EN 45510-6-8:2000 Guide for procurement of power station equipment. Part 6-8: Turbine auxiliaries - Cranes
- UNE-EN 45510-6-3:1999 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 6-3: TURBINES AUXILIARIES. CONDENSER PLANT.
- UNE-EN 45510-5-3:1999 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 5-3: WIND TURBINES.
FI-SFS
- SFS 4966 E-1983 In case of interpretation disputes the Finnish version applies. Date of translation 1987-03-23.
US-CFR-file
- CFR 48-4.1601-2014 Federal acquisition regulations system. Part4:Administrative matters. Subpart4.16:Unique procurement instrument identifiers. Section4.1601:Policy.
ES-UNE
- UNE-EN 45510-2-9:2008 Guide for procurement of power station equipment -- Part 2-9: Electrical equipment - Cabling systems (Endorsed by AENOR in December of 2011.)
European Committee for Electrotechnical Standardization(CENELEC)
- EN 45510-2-8:2004 Guide for procurement of power station equipment - Part 2-8: Electrical equipment - Power cables
- EN 45510-2-2:1999 Guide for Procurement of Power Station Equipment - Part 2-2: Electrical Equipment - Uninterruptible Power Supplies
- EN 45510-1:1997 Guide for Procurement of Power Station Equipment - Part 1: Common Clauses
European Committee for Standardization (CEN)
- EN 45510-2-6:2000 Guide for procurement of power station equipment - Part 2-6: Electrical equipment - Generators
- EN 45510-2-5:2002 Guide for procurement of power station equipment - Part 2-5: Electrical equipment; Motors
- EN 45510-6-4:1999 Guide for procurement of power station equipment - Part 6-4: Turbine auxiliaries - Pumps
- EN 45510-4-7:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 7: Ash handling plant
- EN 45510-4-8:1999 Guide for procurement of power station equipment - Part 4-8: Boiler auxiliaries - Dust handling plant
- EN 45510-6-3:1998 Guide for procurement of power station equipment - Part 6-3: Turbine auxiliaries - Condenser plant
- EN 45510-2-9:2008 Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems
- EN 45510-4-9:1999 Guide for procurement of power station equipment - Part 4-9: Boiler auxiliaries - Sootblowers
- EN 45510-2-7:2002 Guide for procurement of power station equipment - Part 2-7: Electrical equipment; Switchgear and controlgear
- EN 45510-4-3:1999 Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 3: Draught plant
HU-MSZT
- MSZ 05 KGST 1338-1978 Standalone device
- MSZ 05 29.5834-1974 Standalone device
- MNOSZ 18881-1954 Independent equipment testing equipment
- MSZ 05 97.0401-1982 Independent equipment testing equipment
ITE - Institute of Transportation Engineers
- IR-101-2000 Innovative Traffic Control Equipment Procurement Methods: An ITE Informational Report
NATO - North Atlantic Treaty Organization
- ARMP-8-1991 Reliability & Maintainability in the Procurement of off-the-Shelf Equipment (ED 1)
Purchasing equipment,Purchasing equipment,Equipment Purchase,Instrument and equipment purchase,Equipment Purchase,Foreign equipment purchase,How to purchase equipment,Exclusive procurement of equipment,Purchasing foreign equipment,Equipment purchased abroad,Purchasing overseas equipment,Overseas equipment procurement,Exclusive medical equipment,How to purchase equipment,Overseas procurement of equipment,How to purchase equipment,Overseas procurement of equipment,Equipment Purchase Survey,Equipment and instrument procurement,How to purchase equipment