Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Motor load torque calculation method

Motor load torque calculation method, Total:108 items.

The international standard classification for "Motor load torque calculation method" includes: Textile machinery , Construction equipment , Earth-moving machinery , Buses , Keys and keyways, splines , Hulls and their structure elements , Agricultural tractors and trailed vehicles .

The Chinese standard classification for "Motor load torque calculation method" includes: Technical management , Textile machinery and apparatus in general , Architectural engineering construction machinery , Basic standards and general methods , Bus , Chain drive, belt drive and key joint , Transmission system .


Professional Standard - Aviation

  • HB 5873-1985 Model nomenclature of airborne electronic computer

Professional Standard - Petrochemical Industry

  • SH/T 3116-2000 Calculation Method for Electricity Load Design in Petroleum Refin
  • SH/T 3116-2017 Technical specification for assemble inernal floating roofs of storage tank in petrochemical industry

Professional Standard - Textile

  • FZ/T 90042.4-1992 Synchronous belt drive for textile machinery - design calculation for high torque synchronous belt drive

Group Standards of the People's Republic of China

Professional Standard - Railway

  • TB/T 2797-1997 Calculation Condition and Method for Negative Sequence Current of Electrified Railway

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB 12428-1990 Calculation Method of Loading Mass of Passenger Cars
  • GB/T 12428-2005 Laden mass calculating method for buses
  • GB/T 12428-1990 laden mass calculation of buses
  • GB/T 17855-1999 Calculation of load capacity of spline
  • GB/T 12428-2023 Laden mass calculating method for bus
  • GB/T 10175.1-2008 Earth moving machinery - Loaders and backhoe loaders - Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load

Professional Standard-Ships

  • CB/Z 815-2019 Calculation method of wind load on ship
  • CB/Z 263-1997 The design calculating method of storage battery loading hatchway for submarine

Professional Standard - Machinery

  • JB/T 10181.11-2014 Electric Cables - Calculation of the Current Rating - Part 11: Current Rating Equations (100% Load Factor) and Calculation of Losses - General
  • JB/T 9837-1999 Calculation methods of lad capacity of cylindrical gears for tractors

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

GOST

  • GOST R IEC 60287-1-1-2022 Electric cables. Calculation of the current rating. Part 1-1. Methods for calculating the rated current load (100% load factor) and losses. General
  • GOST 34869-2022 Spherical plain bearings. Method for the calculation of static and dynamic load ratings

Defense Logistics Agency

German Institute for Standardization

  • DIN EN 12831 Bb.2:2012 Heating systems in buildings - Method for calculation of the design heat load - Supplement 2: Simplified method for calculation of the design heat load and the heat generator capacity
  • DIN EN 12831 Bb.3:2016 Heating systems in buildings - Method for calculation of the design heat load; Supplement 3: Simplified method for calculation of the heat load of rooms

PL-PKN

  • PN M06514-1986 Lifting devices Loads in the calculations of crane struktures

SCC

  • UNE 115454-1:2004 Earth-moving machinery. Loaders and backhoe loaders. Part 1: Calculation of rated operating capacity and test method for verifiying calculated tipping load.
  • MIL MIL-C-6092A-1960 COMPUTER, AIRCRAFT LOAD BALANCING (SUPERSEDING MIL-C-6092)
  • BS 7769-1.1:1997 Electric cables. Calculation of the current rating. Current rating equations (100% load factor) and calculation of losses-General
  • BS IEC 60287-1-1:2006 Electric cables. Calculation of the current rating. Current rating equations (100% load factor) and calculation of losses. General
  • IEC 60287:1969 Calculation of the continuous current rating of cables (100 % load factor)
  • DIN 3996 E:2018 Draft Document - Calculation of load capacity of cylindrical worm gear pairs with rectangular crossing axes
  • DANSK DS/IEC 60287-1-1:2023 Electric cables – Calculation of the current rating – Part 1-1: Current rating equations (100 % load factor) and calculation of losses – General
  • BS ISO 14397-1:2002 Earth-moving machinery. Loaders and backhoe loaders-Calculation of rated operating capacity and test method for verifying calculated tipping load
  • CEI IEC 60287-1-1/A1:2018 Electric cables - Calculation of the current rating Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • IEC 60287-1-1:1994+AMD1:1995+AMD2:2001 CSV Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • DIN EN 12831 Supplement 3 E:2014 Draft Document - Heating systems in buildings - Method for calculation of the design heat load - Supplement 3: Simplified method for calculation of the heat load of rooms
  • IEC 60287:1969/AMD1:1971 Amendment 1 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287:1969/AMD3:1977 Amendment 3 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287:1969/AMD2:1974 Amendment 2 - Calculation of the continuous current rating of cables (100 % load factor)
  • NS-EN 12831:2003 Heating systems in buildings — Method for calculation of the design heat load
  • IEC 60287:1982/AMD2:1991 Amendment 2 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287:1982/AMD1:1988 Amendment 1 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287:1969/AMD4:1978 Amendment 4 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287:1982/AMD3:1993 Amendment 3 - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287A:1978 First supplement - Calculation of the continuous current rating of cables (100 % load factor)
  • IEC 60287-1-1:1994/AMD2:2001 Amendment 2 - Electric cables - Calculation of the current rating - Part 1: Current rating equations (100% load factor) and calculation of losses - Section 1: General
  • IEC 60287-1-1:1994/AMD1:1995 Amendment 1 - Electric cables - Calculation of the current rating - Part 1: Current rating equations (100% load factor) and calculation of losses - Section 1: General

Korean Agency for Technology and Standards (KATS)

  • KS B 2020-2001 Static load ratings for rolling bearings
  • KS B 2019-2001 Methods of evaluating dynamic load ratings for rolling bearings
  • KS B ISO 14397-1:2015 Earth-moving machinery-Loaders and backhoe loaders-Part 1:Calculation of rated operating capacity and test method for verifying calculated tipping load
  • KS C IEC 60287-1-1:2020 Electric cables — Calculation of the current rating —Part 1-1: Current rating equations(100 % load factor) and calculation of losses — General
  • KS B ISO 14397-1:2005 Earth-moving machinery-Loaders and backhoe loaders-Part 1:Calculation of rated operating capacity and test method for verifying calculated tipping load
  • KS B ISO 10300-2:2004 Calculation of load capacity of belvel gears-Part 2:Calculation of surface durability(pitting)
  • KS B ISO 14397-1-2020 Earth-moving machinery-Loaders and backhoe loaders-Part 1:Calculation of rated operating capacity and test method for verifying calculated tipping load
  • KS B ISO 14397-1-2015(2020) Earth-moving machinery-Loaders and backhoe loaders-Part 1:Calculation of rated operating capacity and test method for verifying calculated tipping load

AGMA - American Gear Manufacturers Association

  • 90FTM2-1990 An Industrial Approach for Load Capacity Calculation of Worm Gears (Verifying and Design)
  • 12FTM05-2012 Combined Effects of Gravity@ Bending Moment@ Bearing Clearance@ and Input Torque on Wind Turbine Planetary Gear Load Sharing

British Standards Institution (BSI)

  • BS IEC 60287-1-1:2007 Electric cables - Calculation of the current rating - Current rating equations (100% load factor) and calculation of losses - General
  • BS IEC 60287-1-1:2023 Electric cables. Calculation of the current rating - Current rating equations (100 % load factor) and calculation of losses. General
  • PD ISO/TS 6336-20:2022 Calculation of load capacity of spur and helical gears. Calculation of scuffing load capacity. Flash temperature method
  • BS IEC 60287-1-1:2006+A1:2014 Electric cables — Calculation of the current rating — Part 1 - 1 : Current rating equations (100 % load factor) and calculation of losses — General
  • BS ISO 14397-1:2007+A1:2019 Earth-moving machinery. Loaders and backhoe loaders. Calculation of rated operating capacity and test method for verifying calculated tipping load
  • BS ISO 14397-1:2007 Earth-moving machinery. Loaders and backhoe loaders. Calculation of rated operating capacity and test method for verifying calculated tipping load
  • PD ISO/TS 6336-21:2022 Calculation of load capacity of spur and helical gears. Part 21: Calculation of scuffing load capacity — Integral temperature method
  • BS IEC 60287-1-3:2023 Electric cables. Calculation of the current rating - Current rating equations (100 % load factor) and calculation of losses. Current sharing between parallel single-core cables and calculation of circulating current losses
  • BS ISO 23886:2021 Aerospace. Collar, threaded, self-locking. Test method for torque and preload

Association Francaise de Normalisation

  • NF P52-612:2004 Heating systems in buildings - Method for calculation of the design heat load.
  • XP ISO/TS 6336-20:2022 Calculation of the load capacity of straight and helical spur gears - Part 20: Calculation of the galling load capacity - Flash temperature method
  • NF E25-035-2:2020 Bolted joints - Part 2 : prevailing torque stainless steel nuts - Functional properties, test methods for torque/clamp force and prevailing torques and proof load
  • NF E25-035-2/A1:2021 Bolted joints - Part 2 : prevailing torque stainless steel nuts - Functional properties, test methods for torque/clamp force and prevailing torques and proof load
  • XP ISO TS 6336-21:2022 Calculation of the load capacity of straight and helical spur gears - Part 21: Calculation of scuffing load capacity - Integral temperature method
  • NF ISO 14397-1:2007 Earth-moving machinery - Loaders and backhoe loaders - Part 1: calculation of the rated payload and test method to verify the calculated tipping load
  • NF E22-057-1:2012 Mechanical transmissions - Shafts and axles, calculation of load capacity - Part 1 : general.
  • NF ISO 14397-1/A1:2020 Earth-moving machinery - Loaders and backhoe loaders - Part 1: calculation of the rated payload and test method to verify the calculated tipping load - Amendment 1
  • XP E22-396*XP ISO/TS 16281:2008 Rolling bearings - Methods for calculating the modified reference rating life for universally loaded bearings
  • NF E58-080-1*NF ISO 14397-1:2007 Earth-moving machinery - Loaders and backhoe loaders - Part 1 : calculation of rated operating capacity and test method for verifying calculated tipping load

CZ-CSN

GSO

  • GSO IEC 60287-1-1:2014 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • BH GSO IEC 60287-1-1:2015 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • OS GSO ISO 14397-1:2013 Earth-moving machinery -- Loaders and backhoe loaders -- Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load
  • GSO ISO 14397-1:2013 Earth-moving machinery -- Loaders and backhoe loaders -- Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load
  • GSO ISO 9043:2013 Mopeds -- Measurement method for moments of inertia

GB-REG

ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc.

International Electrotechnical Commission (IEC)

  • IEC 60287-1-1:2006 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • IEC 60287-1-1:2001 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100% load factor) and calculation of losses; General
  • IEC 60287-1-1:2014 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • IEC 60287-1-1:2006+AMD1:2014 CSV Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • IEC 60287-1-1:2023 CMV Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General
  • IEC 60287-1-1:2006/AMD1:2014 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General

IX-IX-IEC

  • IEC 60287-1-1:2023 Electric cables - Calculation of the current rating - Part 1-1: Current rating equations (100 % load factor) and calculation of losses - General

YU-JUS

  • JUS N.R4.447-1978 Electromechanical components for electronic equipment. Test 13d: operating torque
  • JUS N.R4.447-1991 Electromechanicalcomponents for electronic eguipment. Test 13d: Operating torgue (switches)

International Organization for Standardization (ISO)

  • ISO 14397-1:2007 Earth-moving machinery - Loaders and backhoe loaders - Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load
  • ISO 14397-1:2002 Earth-moving machinery - Loaders and backhoe loaders - Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load
  • ISO/R 617:1967 Calculation of rectangular symmetrical fillet welds statically loaded in such a way that the transverse section is not under any normal stress
  • ISO 14397-1:2007/Amd 1:2019 Earth-moving machinery — Loaders and backhoe loaders — Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load — Amendment 1
  • ISO 23886:2021 Aerospace - Collar, threaded, self-locking - Test method for torque and preload

KR-KS

  • KS C IEC 60287-1-1-2020 Electric cables — Calculation of the current rating —Part 1-1: Current rating equations(100 % load factor) and calculation of losses — General

ESDU - Engineering Sciences Data Unit

  • ESDU 95010 B-1997 COMPUTER PROGRAM FOR ESTIMATION OF SPANWISE LOADING OF WINGS WITH CAMBER AND TWIST IN SUBSONIC ATTACHED FLOW
  • ESDU 83040 D-2013 Method for the rapid estimation of spanwise loading of wings with camber and twist in subsonic attached flow

AENOR

  • UNE-ISO 14397-1:2008 Earth-moving machinery -- Loaders and backhoe loaders -- Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load

Standard Association of Australia (SAA)

  • AS ISO 14397.1:2021 Earth-moving machinery — Loaders and backhoe loaders, Part 1: Calculation of rated operating capacity and test method for verifying calculated tipping load

CU-NC

  • NC 53-41-1990 Construction Designs Wind Pressure Loads Calculating Method

AT-ON

  • ONORM B 5012-2-1995 Structural design of buried water and sewerage pipelines for housing and industry - Load assumptions, method of calculation